My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 09081998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:40:31 PM
Creation date
12/30/2015 6:40:18 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09081998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE OWNER ❑ <br /> ARCHITECT 0 <br /> ORDER CONTRACTOR ❑ ,v ` <br /> FIELD 0 <br /> AIA DOCUMENT G701 OTHER ❑ .'AUG 12 <br /> :; �� .: • <br /> PROJECT: St. Anthony City Hall & Community Ctr. CHANGE ORDER NUMBER: 14 <br /> (name, address) 3301 Silver Lake Road <br /> St. Anthony, .MN 55418 DATE: August 10, 1.998 <br /> TO CONTRACTOR:. ARCHITECT'S PROJECT NO:.- 9214 <br /> (name,address) <br /> CONTRACT DATE: October, 1995 <br /> Graus Construction <br /> 360 Highway 61 North CONTRACT FOR: GENERAL CONSTRUCTION,INCLUDING <br /> Hastings, MN 55033 MECHANICAL AND ELECTRICAL <br /> The Contract is changed as follows: <br /> Modify Steel,ACT,& Electrical Add 3,254.00 <br /> Lower south-drive elevation Add 600.00 <br /> Credit for signage allowance not used Deduct 4,139.00 <br /> Credit for SW site grading Deduct 3,750.00 <br /> Graus Concessions Deduct 3,000.00 <br /> Net deduct .7,035.00 <br /> .Not valid until signed b the Owner Architect and Contractor. • <br /> 9 Y <br /> The original(Contract Sum)(Guaranteed Maximum Price)was . . . . ..... ... . . . . . . . . . . . . . . .$ 3,151,900.00 <br /> Net change by previously authorized Change Orders . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .S 116,343.00 j <br /> The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was. . . . . . . . . .S 3,268,243.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) <br /> (unchanged)by this Change Order in the amount of. .. . .. . . . . . . . . . . . . . . . . . . . . . .S (7,035.00) <br /> The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be . .S 3,261,208.00 <br /> The Contract Time will be(increased)(decreased)(unchanged)by ( )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is <br /> NOTE: This summary does not reflect changes in the Contract Stun,contract Time or Guaranteed Maximum Price which have been authorized by <br /> Construction Change Directive. <br /> Williams/O'Brien Associates Graus Construction The City of St. Anthony Village <br /> ARCHITECT CONTRACTOR OWNER <br /> 1300 Nicoliet Mall 360 Highway 61. N. 3301 Silver Lake Road <br /> Address Address Address <br /> Mi eapolis, N 55 03 astings, M 5 33 St. A ony MN 55418 <br /> BY BY BY <br /> rE i� DATE 19 DATE <br /> 1 CAUTION: You should sign an original AIA document which has this caution printed in red. • <br /> An original assures thatchanges will not be obscured as may occur when documents are reproduced. <br /> AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE <br /> AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6701-1987 <br /> WARNING:unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.