My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 09081998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:40:31 PM
Creation date
12/30/2015 6:40:18 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09081998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 4. PROPOSED IMPROVEMENTS <br /> 4.1 Sanitary Sewer <br /> ' In order to convey the anticipated peak wastewater flow and reduce the basement <br /> backups,the existing sanitary will be removed and reconstructed with larger pipe at <br /> the current location. The segment on Wilson Street from 29`h Avenue NE to 27`h <br /> Avenue Northeast will be reconstructed with 24-inch(24")PVC pipe. The proposed <br /> 24-inch(24")pipe will provide a theoretical capacity of 3,400 to 5,400 gpm which <br /> is slightly in excess of the projected peak flow for the area. <br /> The proposed sanitary sewer improvements are shown on Figure 2 in Appendix A. <br /> ' 4.2 Watermain <br /> The-existing water mains will be entirely or partially exposed by the excavation <br /> required for the sanitary sewer and storm sewer improvements. In addition,many of <br /> ' the water service lines to the individual properties will be removed or disconnected <br /> for a period of time. The excavation for the other utilities provides a timely <br /> ' opportunity for improvements to the water distribution system before significant <br /> problems are experienced. <br /> ' The proposed water main improvements consist of replacing the existing mains with <br /> similar sized new ductile iron pipe mains and copper service taps and lines. The <br /> existing pipe sizes are sufficient for delivery of adequate potable water and fire flow <br /> volume at a reasonable pressure and head loss. <br /> 1 <br /> Replacement of the service taps and lines should improve the water quality by <br /> ' reducing the potential for lead to enter the system and possibly increase the pressure <br /> by providing a clean service pipe. <br /> ' The proposed water system improvements are shown on Figure 3 in Appendix A. <br /> 4.3 Storm Sewer <br /> ' The proposed storm sewer improvements include replacing the 36-inch (36") RC <br /> pipe at the intersection of Wilson Street and 29`h Avenue with a 33-inch (33") RC <br /> pipe. This will provide increased capacity downstream in the Wilson Street system <br /> ' 'by reducing the flow which can be accepted into the system'of this location. For <br /> storm events which exceed the capacity of the storm sewer system, the existing <br /> overland overflow route will be maintained. The existing 36-inch(36")RCP at the <br /> intersection of Pahl Avenue and Wilson Street will be replaced with two(2)24-inch <br /> (24")arch RC pipes which are equivalent to a 36-inch(36")round to accommodate <br /> the lowering of Pahl Avenue by approximately one foot (P). This will provide for <br /> additional storm storage capacity in this intersection preventing the flooding of <br /> adjacent structures. <br /> ' City of St.Anthony-1999 Street&Utility Improvement Project <br /> Feasibility Report A <br /> ' WSB Project No.1065.21 `YSB <br /> a <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.