My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 09081998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:40:31 PM
Creation date
12/30/2015 6:40:18 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09081998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 7. FEASIBILITY AND RECOMMENDATION <br /> Project costs are anticipated to be approximately$1,215,000 which includes the total street <br /> ' and utility reconstruction of Wilson Street form 27'h to 29`h Avenues, Pahl Avenue from <br /> Wilson Street to Coolidge Street and three alleys from Wilson Street to Coolidge Street <br /> between Murray Avenue and 27th Avenue. <br /> Due to the inadequate capacity of the sanitary sewer mains and the storm mains this project <br /> is both feasible and necessary from an engineering standpoint. The installation of the <br /> ' sanitary and storm sewer.will require the total removal of the existing street and the partial <br /> removal and exposure of the existing water distribution lines. Under these conditions its is <br /> both feasible and necessary to replace the existing street and water main. Furthermore,due <br /> to the location and condition of the existing utilities, the available street right-of-way, the <br /> existing soils conditions,and the need to provide utility service to all of the properties in the <br /> project area,other methods of improving the utility systems and the roadway are not feasible <br /> ' or cost effective. <br /> Based on our analysis and date presented the proposed project is feasible,necessary and cost <br /> ' effective from an engineering standpoint. We recommend the reconstruction of the sanitary <br /> sewer, water main, storm sewer and streets as detailed this report. <br /> 1 <br /> 1 <br /> 1 <br /> City of St.Anthony-1999 Street&Utility Improvement Project. <br /> Feasibility Report S <br /> WSB.Project No.1065.21 WSB <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.