Laserfiche WebLink
r7ps 4 c1 e <br /> ko <br /> ti <br /> C <br /> r <br /> I <br /> m <br /> I <br /> Voucher Detail List ko <br /> _ 01M m <br /> WSB A*a 1999 Street and Watennaln Improvements By.- K Doty <br /> Project Locadon: St.Anthony,MN Date: 07M)99 m <br /> WSB Proi9 t Md. 1085.22 Vouct w No. 3 <br /> Storm Sewer Improvements- Base Bid <br /> Contract Contract Corn sled This Month Total To Date <br /> LIM ram Unit Unit Price Quantity Total: Quantity Total S Quantity Total S <br /> Na Nwber DescrIMM U) <br /> 74 DN 2 GRANULAR BEDDING MATERIAL(LV) CU YD 37. 1DWAO $7,750.00 0.00 9.00 50.00 m <br /> 73 2502.541 I.6'PERFORATED PE PIPE DRAIN LIN FT 37 3400. 52:.500.00 1,260.001 $9,450. 1,260.00 $9AS0.00 10 <br /> 78 2503.518 F&115'FLAPGATE(R-6050SF15) EACH sm 1.00 $550.00 OAOt 0.00 $OAO D <br /> 77 2S03Si9 F&116"FLAPGATE(R-SD50-SFi8) EACH 3575.00 1.00 $57500 0.00 0.00 $0.00 U) <br /> cn <br /> 78 250].519 F3I21'FLAPGATE(11,5050-SF21) EACH $825.00 1.00 $moo O. SD. 0.00 $0.00 C <br /> (7 <br /> 79 2503.521 51'SPAN RC PIPE-ARCH SEWER CL ILA LIN FT 587.57 WCOD $51.140.88 110.00 $9,892. 589.0 $31.578.73 D <br /> 80 2503541 WRCPIPEDESIGN3WSCLASSV LIN FT 320.3 28700 $5.949.51 122.00 $2.528.06 145.00 $300685 <br /> M <br /> 81 2MI S41 15'RC PIPE DESIGN 3008 CLASS V UN FT $22.91 434.00 $10.401.14 323.00 $7.999.83 928.00 57.3WS3 In <br /> 82 200&541 18'RC PIPE DESIGN 3000 CLASS 111 UN FT 124.44 250.00 $6.110.00 240.00 $SAM 240.00 35,59660 Z <br /> 83 2503MI 33'RC PIPE DESIGN 3008 CLASS III LIN FT $42.26 179110 $7.564.84 181 $7,649.08 181.00 $7.649.06 (7 <br /> 84 250&.441 38'RC PIPE DESIGN 3006 CLASS III UNFT $49.57 548.00 $27.t643B 649.00 $27.213.90 549.0 $27.213.93 <br /> 8S 060SAM 117•PVCPIPESEWERC-wS UNFT $2�2 204110 55.410.08 0. $000 OAD $0.00 <br /> 86 2505.601 CONST.DRAINAGESTR.36'7FESEC.MANHOLE UNFT 1156.60 11.50 31,70940 11A3 $%77&51 itA3 $1.778.81 <br /> e7 2508.501 CONST.DRAINAGESiR. DES.4840M UNF7 317SAS 1&80 32,865:11 7.16 $1.25692 7.15 $1,25832 <br /> 86 2506.501 CONST.DRAINASE STR. DES.544020 LIN FT 5220.00 5.50 31,210. moo $0.00 0.00 $0.00 <br /> 89 2500.501 CONST.DRAINAGESTR. DES.60�4020 LIN FT 526290 11.30 $2,968 11.20 $294000 11.20 52940.0 <br /> 90 2508.501 CONS$DRAINAGE SM DES.72.4020 LIN FT- 528856 2510 30.740 61 ' 25.8 $$72486 25.05 38 724,86 <br /> 61 2508.501 CONST.DRAINAGESM DES.9D4020 LIN FT $456 14.90 88.788 SA4 3283342 14.89 $6.782AC <br /> 82 2908.501 CONSTDRAiNAGE SiR. 51-SPAN ARCH TEE SEC.MANHOLE LIN FT 5731 9.90 $7.241AS 000 $0.00 9.84 $2147.96 <br /> 03 290&902 CONST.DRAINAGE STR. DES.SPECIAL(7M EACH $675. 2200 $19.250 12.00 $1%500.00 1200 $10.800.00 <br /> 94 2508.618 ICASTINIGASSEMBLY EACH $31(L iS.O 54.88396 0-00 $0.00 0.01) $000 <br /> 95 230&602 PIPE DRAIN CONNECTION TO DRAINAGE STRUCTURE EACH $75. 18.00 $1.350.00 OAO $0.00 0.00 $0.00 <br /> N <br /> 98 0608.602 CONNECTTO EXISTING STORM SEINER EACH 3350.00 14$0 34.900.00 OAO $0.00 3.00 $1,050$0 A <br /> 47 I 0508.602 1S*RCPAPRON W/TRASH GUARD EACH 3838.00 3.00 $1914.00 1110 $63600 1.0 $MOD <br /> f+ <br /> W 2573.501 BALE CHECK EACH 59.50 220$0 $1.870.00 0.00 30$0 000 $0.00 <br /> 99 J 2451.507 GRANULAR FOUNDATION MATERIAL(LV) C I YD 80.01 600A0 $5.001 $0.00 0.00 $0.00 m <br /> Total Storm Sewer f m rovements-Base Bid $212,"CG2 S98.S1829 $151.03605 <br /> m <br /> - [9 <br /> �0 <br />