My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07131999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 07131999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:11:22 PM
Creation date
12/30/2015 4:11:05 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 07131999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Voucher Detail List <br /> gq <br /> WSEI Project SiNer-Point Park&Central Park Stonnwater Imprwooment Project BY. K Daly ti <br /> Project Location: City of St.Anthony Dafte 06130199 r- <br /> MB Project No.- 1065.30 voucher Na <br /> SILVER POINT PARK CONSTRUCTION-BASE BID <br /> Contract Contract CorqwpI ebad This month Total To Daft <br /> LIM Item It Price Quantity TOW 3 Quantity Total I Quantity Taus S %D <br /> NO. Number DeredpEon - --- I I I (S) <br /> -78 1 1)2"THICKMWDOT TYPE 41 BITUMINOUS WEAR COURSE(BASKETBALL COURT) SF $1. 215D.00 $3,208.00 moo $0.00 0.00 <br /> 79 2"THICKUMIDOT TYPE 31 BrTUMNOUS BASE COURSE(MSKETRALL COURT) SF $1.13 215D-00 $2.429.50 D.00 $0.00 0.00 $0.00 <br /> -00 3*THICK MWOOT TYPE 41 BITUMINOUS WEAR COURSE-FULL DEPTH(TRAIL) SF $137212 990D.OD $17.026.00 moo =D 0.61) $D'_ <br /> 5 <br /> Ne, Jv THICK PORTLAND CEMENTCONCRETE PAVING SF X63 2174.00 $14.413.82 0-00 _ $0.00 1.450.00 39.6w.-64 <br /> 132 CHAIN LINK SOFTBALL BACKSTOP IS $9,00.00 100 $9,05D.00 0.00 1 $0.00 0.00 $0 <br /> 83 CHAIN LINK PLAYERSSACKETBALL,FENCE 'LF $42.81 126.00 $5,351.25 0.001 $0.00 0.00 $000 <br /> 84 AGLIME CY $W.64 800.00 $16,512.00 CLOO $0.130 0.00 $ <br /> U) <br /> 86 PEA GRAVEL(1@'MINUS) CY $27.18 75.00 $Z038.5 25.00 $aygm 25.00 $679-W w <br /> as BASKETBALL PAVEMENT MARKING LS $1,500.00 1.01) $1. 0.00 $0.110 0.00 $D.00 90 <br /> 3) <br /> LAY STRUCTURE LS $40.0W.00 1.00 $40.000. 0.00 $0001 0.00 W.00 U) <br /> U) <br /> BIKE RACK EACH $1.216.00 1.00 $1.216.0 0.00, 6 O.OD 0 <br /> as r) <br /> PARK BENCH EACH $923.24 4.00 33,71Z OLOO 0.00 $0.00 - <br /> 3) <br /> 90 AUSTRIAN PINE-W HT. EACH $300.00 21.00 S8L580. moo $ 0.00 Xoo 4 <br /> ITI <br /> 91 FALL GOLD ASH-2.S'CAL(8&6) EACH $300L00 9.00 $WON0. 0.00 $ 0.00 $0.00 U) <br /> 02 AUTUMN BLAZE MAPLE-Zlir CAL(6&8) EACH $300.00 13.00 $3.9m.00 0M $ - 0.00 $0.00 <br /> Z <br /> 93 SPARKLER CRAB-r CAL(m) EACH 3300.00 12.00 $3.(100.013 0.00. $0.00 0.00 $0.00 9 <br /> D.00 <br /> 0 <br /> swoo <br /> 00 <br /> ID $OM <br /> $0, <br /> SDI <br /> 5D. <br /> D <br /> 94 ARROWWOOD VIBURNUM-31r CONT. EACH $80.00 28.00 $1.090.00 0.00 ftoc 0.00 $0.00 <br /> 95 HENRY KELSEY SHRUB ROSE-W CONT. EACH 580'0 12.00 $720.00 0.00 $0.00 0.00 $0.00 <br /> N so 00 <br /> 913 SOD SY $7-04 114D.00 $2,32S. 0.00 $a. 0.00. $0.00 <br /> 97 SEEDING(INCL FERTILIZER,MULCH&SEED MIX MA) AC $1.816.6 4.50 $0.170.20 OLDO $0.00 0.00 30.001 <br /> 98 ISEEDING(INCL FERTILIZER.MULCH&SEED MIX 2" AC $W20 0.15 $131.58 0.00, $0.001 0.00 $o i 00 <br /> TOTAL SILVER POWT PARK CONSTRUCTION-BASE BID $148 047.21 $679.501 $10,346.04 <br /> A OMMS $40,350.95 1 _68.13 <br /> Ql <br /> WL DID <br /> (SI <br /> (A <br /> • cgs • <br />
The URL can be used to link to this page
Your browser does not support the video tag.