My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09141999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 09141999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:09:51 PM
Creation date
12/30/2015 4:09:33 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 09141999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/18/99 8:36 Ann PROPOSAL Pagel <br /> Metro Transit Contract No. 98-015-72 EXHIBIT C • <br /> with the City of St.Anthony <br /> Quantity UNIT <br /> NO. DESCRIPTION Estimating QTY. PRICE TOTALS <br /> Factor <br /> 1.0 RETROFIT/INSTALL: NEW SIGN ON EXISTING SIGN MOUNTING STRUCTURE. <br /> 1.1 Retrofit existing sign with new sign. 34 x $20 = 680 <br /> 1.2 Install new sign on existing structure. 12 x $20 = 240 <br /> 1.2.1 Lengthen existing pipe or post. 50%of 1.2 6 x $20 = 120 <br /> 1.3 Install holder. x $30 = 0 <br /> 1.4 Special 1.4: x = 0 <br /> 1.0 Sub-total = $1,040 <br /> 2.0 REMOVE: EXISTING STRUCTURE WHERE EXISTING BUS SIGN&STOP ARE VACATED/RELOCATED. <br /> 2.1 Remove and patch, soil/blacktop. 50%of 1.1 21x $201 = 1 34 <br /> 2.2 Remove and patch, concrete. 50%of 1.1 21 x 1 $201 = 1 34 <br /> 2.0 Sub-total I = 1 $68 <br /> 3.0 INSTALL: NEW SIGN MOUNTING STRUCTURE AND SIGN. <br /> 3.1 U-post(concrete). 18 x $80 = 1,434 <br /> 3.2 U-post(non-concrete). 62 x $70 = 4,346 <br /> 3.3 Round pipe(concrete). 0 x $100 = 0 <br /> 3.41 Round pipe (non-concrete). 0 x $120 = 0 <br /> � 3.0 Sub-total = I $5,779 • <br /> 4.0 OTHER. l <br /> 4.1 Special 4.1: x = 0 <br /> 4.21 Special 4.2: I ( x = 0 <br /> 4.0 Sub-total = $0 <br /> GRAND TOTAL = $6,887 <br /> Contingency: 10% NOT TO EXCEED = $7,576 <br /> CHECK HERETO SELECT(unit prices) PAYMENT OPTION 1!10 1;< . ! <br /> CHECK HERE TO SELECT(time & material) PAYMENT OPTION <br /> Estimated %of work by City's own resources. <br /> Estimated % of work by City's <br /> ' sub-contracts.t <br /> oork b C Etinaed° reemnt _. <br /> Record of revisions: by on ; by on ; by_on ; by—on <br /> City or MCTO : of J of of of <br /> Date received by MCTO: <br /> Version <br /> v1 P":ment O tion;aid Estimated o of u+ork entered b . Date;:: <br /> Interagency Agreement, Capital EXHIBIT C <br />
The URL can be used to link to this page
Your browser does not support the video tag.