My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09252001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 09252001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:53:47 PM
Creation date
12/30/2015 7:53:34 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 09252001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43 <br /> St.Anthony Village City Hall Community Center A-SANTF;u iG,..;,c <br /> St.Anthony Village,MN 8(112001 <br /> PHASE II <br /> Exterior Entry <br /> AREA PRODUCT DESCRIPTION QUANTITY COST TOTAL <br /> EACH SQ:FT. LIN.FT. <br /> Front Landscaping Remove existing shrubs and flag poles. <br /> Relocate flag poles to monument sign. - 1 $ 500.00 $500.00 <br /> Low shrub replacement 30 $ 35.00 $1,050.00 <br /> Cedar bedding 486 $ 1.50 $729.00 <br /> Total $ 2,279.00 <br /> Entry Landscaping <br /> AREA PRODUCT DESCRIPTION QUANTITY COST TOTAL <br /> EACH SQ.FT. I LIN.Fl. <br /> Stamped color concrete 546 $ 10.00 I $5,460.00 <br /> Bike loops 1 $ 987.00 $987.00 <br /> Bench 1 $1,107.00 $1,107.00 <br /> Retaining wall 37.75 $ 23.50 $887.13 <br /> Patio Shrubs at bench&wall 34 $ 22.90 $778.60 <br /> Trees(balled&burlapped) 7 $ 270.19 $1,891.33 <br /> Lamp posts with flags 9 $1,500.00 1 $13,500.00 <br /> Berms 1500 $ 1.25 $1,875.00 <br /> Re-sod(square yards) 460.77 $ 3.00 $1,382.31 <br /> Total I $ 27,868.37 <br /> Community Center <br /> AREA PRODUCT DESCRIPTION QUANTITY COST EA TOTAL <br /> CH SQ.FT. LIN.FT. <br /> New door frames/signage 6'0";lighting/wood <br /> ® frames '8 $3,500.00 $17,000.00 <br /> Community service signage 1 $5,000.00 .$3,000.00 <br /> Total $ 20,000 00 <br /> I <br /> Grand Total I $ 50,147.37 <br /> COST SCHEDULE for Jay <br />
The URL can be used to link to this page
Your browser does not support the video tag.