My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09252001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 09252001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:53:47 PM
Creation date
12/30/2015 7:53:34 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 09252001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Use of the facility continued: <br /> Sister City meetings Kiwanis Pancake Chili Contest / <br /> Crime Prevention Breakfasts Chamber of <br /> Coalition meetings Orchestra Concerts Commerce <br /> Various meetings Volunteer Dinners <br /> involving City Staff <br /> Work of the Committee: <br /> The consultant and Committee generated many ideas about how to solve the problems: <br /> • install large and attractive signage <br /> • add pronounced landscaping <br /> • renaming of the building <br /> • build a canopy over the front doors which would dramatically improve the entrance <br /> • increase sound control <br /> • provide a community information bulletin board <br /> • eliminate the brick overhang in front of the entrance <br /> • build a permanent place for room schedules <br /> • construct monument sign <br /> y <br /> • increase seating inside and outside <br /> • clearly mark entrances to rooms <br /> • install rugs <br /> • add wall treatments to-warm the looks and improve acoustics <br /> • build a kiosk with seating <br /> • open up city offices <br /> • minimize the wall by the bathrooms <br /> • better mark Police hall and entrance <br /> • add the St. Anthony logo as a back drop to the Council chambers dais <br /> • improve the fagade by adding decorative cornerstones <br /> After coming to agreement on which improvements to put in place, cost estimates were drawn up <br /> by the consultant. To keep budgeting manageable, improvements will be phased over a three <br /> year period at a cost of$50,000 each year. The committee agreed on the order of changes based <br /> on a balance desire to improve the interior and exterior simultaneously. <br /> First year improvements <br /> First phase of improvements to exterior fagade and signage <br /> Construct permanent seating <br /> Add building direction sign with pamphlet storage <br /> Install sound panels <br /> Painf"above burnished block <br /> Modify back wall by bathroom with etched glass panels <br /> Install sidelight, sound seal and new door to City Hall offices <br />
The URL can be used to link to this page
Your browser does not support the video tag.