My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06102003
StAnthony
>
City Council
>
City Council Packets
>
2003
>
CC PACKET 06102003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:01:58 PM
Creation date
12/30/2015 8:01:47 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 06102003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br /> May 28, 2003 <br /> Page 7 <br /> 1 <br /> 2 Councilmember Sparks asked what the life of the water treatment plant would be if these repairs <br /> 3 were made. Mr. Hubmer responded approximately 30 to 50 years. Councilmember Sparks <br /> 4 asked how old the plant was at this time. Roger Larson, Finance Director, stated the water. <br /> 5 treatment plant was 45 years old. <br /> 6 <br /> 7 Mr. Hubmer stated that the electronic controls in the plant were being watched. He said that if <br /> 8 they break down, it-is difficult to find the parts for repairs. That is why, he felt, a modern control <br /> 9 system was needed. Otherwise, he felt the other aspects of the plant were in good condition. It <br /> 10 only needed the normal kinds of attention, such as maintenance and painting. <br /> 11 <br /> 12 Councilmember Sparks stated the Council was led to believe that there was at least 20 years or <br /> 13 more left in the life of the building. Mr. Momson responded that there was more than one <br /> 14 building. <br /> 15 <br /> 16 Mr. Hubmer added that there were a number of buildings. Some of the buildings were in good <br /> 17 condition and others had minor concerns. Repairs, such as a new roof, had recently been <br /> 18 completed. He felt the condition of the water treatment plant was good once improvements were <br /> 19 made. Mr. Hubmer stated that the next improvement that would be needed were iron filters. <br /> 20 <br /> 21 7. Kenzie Terrace Water Main and Sanitary Improvements. <br /> 22 Mr. Hubmer stated that plans and specifications for the Kenzie Terrace water main and sanitary <br /> 23 sewer improvements were complete. He indicated that discussions were still being held with the <br /> 24 Metropolitan Council regarding their concerns associated with the Met Council Meter Station <br /> 25 located in the vicinity of Lowry and Harding Streets in Minneapolis. A meeting with the <br /> 26 Metropolitan Council is anticipated to discuss the issues associated with the proposed sanitary <br /> 27 and sewer improvements in the first week of June. <br /> 28 <br /> 29 Mr. Hubmer stated that, following this meeting, he anticipated the plans would be revised to <br /> 30 address the issues presented by the Metropolitan Council and that advertisements for bids would <br /> 31 begin at the end of June, with a bid opening in mid-July and construction beginning thereafter. <br /> 32 <br /> 33 Mr. Hubmer stated that a neighborhood meeting would be held in July to discuss the project <br /> 34 schedule and a proposed scope of impacts to the residents and businesses adjacent to the <br /> 35 proposed improvements. <br /> 36 <br /> 37 8. 2003 Street Reconstruction. <br /> 38 Mr. Hubmer reported that Phase 1 of the 2003 Street Reconstruction, which is Edward Street <br /> 39 from 33rd Avenue to 34`h Avenue and 34`h Avenue from Stinson Boulevard to Edward Street, was <br /> 40 nearing completion. All the utilities had been installed and the road reconstruction work was <br /> 41 progressing according to schedule. He also stated that the contractor had requested that the <br /> 42 construction schedule be modified. The new schedule anticipated completion of this year's <br /> 43 project by the end of August, reducing the construction period by nearly two months. In <br /> 44 addition, the contractor had provided assurances to the City that, if the project did not proceed in <br /> 45 accordance with expectations, the contractor would cease operations and return to the original <br /> 46 construction schedule. Mr. Hubmer anticipated that by moving the construction schedule up two <br />
The URL can be used to link to this page
Your browser does not support the video tag.