My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 06161998
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1998
>
PL PACKET 06161998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:36:20 PM
Creation date
12/30/2015 5:36:05 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1998
SP Name
PL PACKET 06161998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br /> DATE: June 16, 1998 <br /> TO: ' Planning Commissioners /� <br /> FROM: Kim Moore-Sykes, Management Assistant ', �,�":J <br /> ITEM: 98-06 Subdivision/Replat of Lot 1, Block 1, Beutz Addition; <br /> Tom Hanka, Wirth Companies, Apache Medical Building. <br /> BACKGROUD: <br /> Mr. Tom Hanka of the Wirth Companies, submitted an application to subdivide and replat Lot <br /> 1, Block 1, Beutz Addition, a vacant lot to the southwest of the Apache Medical Building. Mr. <br /> Hanka is proposing to split Lot 1, Block 1, Beutz Addition and join 74 feet to the Apache <br /> Medical Building parcel, which is Lot 1, Block 2, Apache Plaza. The remaining 74 feet of Lot <br /> 1, Block 1, Beutz Addition will be replatted to include the vacant parcel, Lot 2, Block 2, <br /> Apache Plaza, that adjoins it to the east. <br /> Mr.'Hanka has submitted copies of documents to the City that indicate that the Wirth <br /> Companies are current owners of record as the Wirth Companies or Stinson Boulevard Corp., <br /> a subsidiary of the Wirth Companies. The City Attorney has been given the proposed plat map <br /> and copies of the deeds for his review. <br /> ANALYSIS: <br /> Lot 1, Block 1, Beutz Addition is being subdivided and replatted to provide the Apache <br /> Medical Building space for additional future parking needs and to combine the two vacant lots <br /> to increase the square footage available for redevelopment of the newly replatted lot. An <br /> easement between the current lots-that allows access to.the.Apache Medical building will _ <br /> continue to be maintained after the subdivision and replatting. <br /> The combining the two vacant lots will bring Lot 1, Block 1, Beutz Addition into compliance <br /> with Chapter 15, Subd. 4., (1), of the City's Ordinance, which states that all lots must abut by <br /> their full frontage on a public street. The replatting of the vacant lots creates a lot that meets <br /> the minimum lot size requirement under the same Chapter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.