My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 08192003
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2003
>
PL PACKET 08192003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:43:48 PM
Creation date
12/30/2015 7:43:31 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 08192003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 3 <br /> Park and Open Space Natural Environment and Open Space <br /> The redevelopment will boast an impressive central park fa- The water quality of Silver Lake is a critical issue to the neighborhoods <br /> cility that will act as the focal point of the development and a surrounding the lake and the Village at St. Anthony will do its part to pre- <br /> strong amenity for the whole St. Anthony community. In ad- serve and improve that water quality through careful handling of storm water <br /> dition to the new east-west parkway, it is a major organizing and enhancements to the surface water management system. <br /> element of the interior of the site. Removal of the shopping <br /> center will alter the current image of the site and the devel- The redevelopment area will include an open space that will function as an ■ <br /> opment of the park facility will be a focal point for the new integrated stormwater management system connected through the site. <br /> development. The network is not planned as an upfront implementation step, as is the ■ <br /> central park, but rather will be phased and integrated as the site develops. <br /> Leading away from the park will be a series of trails, side- Where possible, stormwater will be kept above ground and open to the air, r <br /> walks and connected open spaces that will link the site inter- in ponds, fountains, and other water features that will allow for maximum <br /> nally and enhance connections with the surrounding neigh- penetration of surface water into the ground and maximum benefit as an <br /> borhoods. This integrated system of open spaces through- amenity to existing and future development. <br /> out the development will fulfills both aesthetic and functional <br /> purposes. The network will serve to connect the various ele- ■ <br /> ments of the development to each other and will also help <br /> foster connections at the edges of the development with the ■ <br /> rest of the community. <br /> • North Pond Park Area: 3.22 acres ■ <br /> • South Pond Park Area: 2.4 acres <br /> 12 Village at St. Anthony Framework Manual <br />
The URL can be used to link to this page
Your browser does not support the video tag.