Laserfiche WebLink
C. Adequate drainage is provided to reduce exposure of flood hazard. <br /> Section 6: Water Supply System <br /> The responsible person shall require within flood prone areas, new and replacement water <br /> supply systems to be designed to minimize or eliminate infiltration of floodwaters into <br /> the systems. <br /> Section 7: Sanitary Sewage and Waste Disposal Systems <br /> The responsible person shall require within flood prone areas: <br /> A. New and replacement sanitary sewage systems to be designed to minimize or <br /> eliminate infiltration of flood waters into the systems and discharges from the <br /> systems into flood waters, and <br /> B. On-site waste disposal systems to be located to avoid impairment to them or <br /> contamination from them during flooding. <br /> Section 8: Definitions <br /> "Development" Any man-made change to real estate,including but not limited to <br /> construction or reconstruction of buildings,installing manufactured homes or travel trailers, <br /> installing utilities, construction of roads or bridges,erection of levees, walls, or fences, <br /> drilling,mining,filling, dredging, and storage of materials. <br /> "Flood" A general and temporary condition of partial or complete inundation of normally <br /> dry land areas from overflow of inland or tidal waves,or the unusual and rapid <br /> accumulation or runoff of surface waters from any source. <br /> "Floodplain" or"Flood Prone Area"Any land area susceptible to being inundated by <br /> water from any source(see Flood). <br /> "Floodproofm' g" Any combination of structural and non-structural additions, changes or <br /> adjustments to structures which reduce or eliminate flood damage to real estate or improved <br /> real property, water and sanitary facilities, structures and their contents. <br /> "Manufactured dome" A structure, transportable in-one or more sections, which is built <br /> on a permanent chassis and is designated for use with or without a permanent foundation <br /> when attached to the required utilities. <br /> "New Construction"means, for the purposes of determining insurance rates, structures <br /> for which the "start of construction" commenced on or after the effective date of an <br /> initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent <br /> improvements to such structures. For floodplain management purposes, new construction <br /> means structures for which the start of construction commenced on or after the effective <br /> date of a floodplain management regulation adopted by a community and includes any <br /> subsequent improvements to such structures. <br /> 3 <br />