Laserfiche WebLink
SHORT-ELLIOTT-HENtKICKSON, INC. <br /> ® ® city of . Anthony <br /> CONSULTING ENGINEERS <br /> August 2. 1982 v <br /> ® ® $7.YALE,MINNESOTA • CHIPPIEWA FAILS.WISCONSIN Page 2 t <br /> August 2, 1982 REI ST. ANTHONY, MINNESOTA <br /> 'SALVATION .ARMY CAMP DRAINAGE areas. The engineering services also would provide a basis for <br /> OUR FILE NO. 81071 coordination between all designated representatives of St. Anthony, <br /> Columbia Heights, New Brighton, Ramsey County, the Salvation Army, <br /> Rice Creek Watershed District and Anoka County, as required. <br /> The foregoing study is to be presented in a bound report form with <br /> complete discussion, preliminary drawings, substantiating data, design <br /> City f St. Anthony asis and calculations together with cost estimates for the proposed <br /> Y Y facilities; including suggested apportionment of cost to each <br /> 3301 Silver Lake Road participating and affected unit' of government. The drainage problems <br /> Sr-. :,ntllony, Mn. 55418 relating to Stinson Boulevard will be dealt with in a separate, section <br /> Atte,iLion: Mr. Larry Hamer, of the report such that such data can be easily identified. <br /> Director of Public Work: Our compensation for the above services shall be on the basis of 2.30 <br /> times payroll cost, mileage and out of pocket expenses. The hourly <br /> charge-out rate shall be based upon the attached schedule. <br /> Pursuant to our recent conference with Mr. Larry Hamer, Director of The estimated cost on the foregoing basis for services of this <br /> Pul)1ic works, we are pleased to submit herewith our proposal for proposal will not exceed $7,000. <br /> engineering services for investigation, study and report of surface <br /> drainage to the Salvation Army Camp property in St. Anthony. This Under this proposal, St. Anthony agrees to make available to us and <br /> drainage is a product of surface runoff from areas within the cities furnish us with all existing improvement information in the way of <br /> of 1,ew Brighton and Columbia Heights. Subject surface drainage flows maps, records, plans, contours, profile studies, etc. which are <br /> cverlar,d on Ramsey County Road "E" in combination with a limited available in response to work undertaken herein, including such <br /> ai:ouat of existing storm sewer which drains Anoka County Road 2 information as may be pertinent and necessary from Columbia Heights, <br /> intersection. We are advised that this work will be performed for St. New Brighton, Ramsey County and Anoka, County. <br /> Anthony. New Brighton, Columbia Heights, Ramsey County and Anoka <br /> County; authority being embraced in an inter-municipal agreement with It is to be specifically understood that engineering services in this <br /> St. Anthony functioning as the contracting agency therefor. If the proposal do not include the cost of laboratory analysis, the cost of <br /> r-:ojet-t does not proceed to plans and specifications, St. Anthony will boundary surveys or underground exploration of the subsurface <br /> ;.he entire cost of the study. if the atu,ly results in plans and conditions. These items wil be furnished on request and our actual <br /> ifi,.atiins being ordered, a ;Dint rn�wrr agreement shall be cost therefore. <br /> enured with all municipalities and counties participating. <br /> The specific area of study is the property owned by the Salvation It is to be understood that in signing this proposal we are authorized <br /> to proceed only with the work outlined herein. No work in conjunction <br /> kLmy. all within St. Anthony. bounded on the east by Silver lake Road, with plans and specifications will be undertaken without further <br /> woe;,. -)f. Stinson Boulevard, South by Silver :a-:e and on the north by authorization. <br /> fiams• y County Road "E". n,(! stu:ly ':ili al::c include Stinson Blvd. <br /> foiii• C:)unty Road "E" to the Ilei jhts s%:•imminq beach at Silver It is to be specifically understood that if we are authorized to make <br /> Lake. The 'drainage problems relating to- this 'portion of Stinson. - -- --- - -this study and report that work shall commence as soon as weather <br /> 'tots.ward and the Salvation Ar.•::;�, Celan will be i!:C111-led in the study. <br /> permits and be completed within 90 days thereafter unless the scope of <br /> the work is enlarged and/or another completion date is mutually agreed <br /> our proposed engineering services consist of the investigation and on. <br /> study of surface drainage including the Salvation Army property. The <br /> investigation shall include the consideration of underground <br /> conveyance. The discharges reaching the Salvation Army property will <br /> 1�e studied together with the capacities of individua_- existinj ponding -- <br /> i <br /> :00 GOPHER BUILDING•221 EKT LITTLE CANADA ROAD•?T.PAt 1,111NNE?OEA 5511'•PHOM -6121 484-0271 <br />