Laserfiche WebLink
1 <br /> o Phase III Build in s D end E - 4-8 story buildings; poured concrete i SCHEDULE S-1 <br /> construction; brick wood exterior; building amenities include ASSESSED VALUES OF MINIMUM IMPROVEMENTS <br /> greenhouse- (each floor); arts and crafts; guest room; card room; <br /> public toilet; library; workshop; trash chute (each floor); 2 eleva- <br /> tors (1 passenger/l freight); underground parking (106 stalls); visitor Phase L $1,272,000 <br /> Parking (ramp); security office (full time) including security system ; <br /> with emergency-buzzer system in each room; central TV antennae with---- i Phase II $1,946,500 <br /> cable hookup (each room); fire'sprinkler/central fire alarm systems; outdoor <br /> patios/decks; storage; kitchen appliance package;.rooftop gardens/ Phase III $3,266,000 <br /> landscaping/outdoor recreation areas;- asphalt driveways, including <br /> parking with 1.5 spaces per dwelling unit; asphalt and B-6 concrete <br /> curb; sidewalks; pond area with aerator.; Phase III will consist of <br /> at least 204 dwelling units. <br /> } <br /> s <br /> i <br /> ( <br /> _f <br />