My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01101984
StAnthony
>
City Council
>
City Council Packets
>
1984
>
CC PACKET 01101984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:54:34 PM
Creation date
12/30/2015 3:54:13 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 01101984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James Fornell <br /> Page 2 <br /> January 23, 1981 <br /> C) Meet and confer with representatives of the Salvation <br /> Army Camp to determine whether the Salvation Army will <br /> provide for a roadway easement for that portion of <br /> their property which may be affected by our planned <br /> improvement. As a point of information, this may in- <br /> clude an easement of up to thirty feet on the St. <br /> Anthony boundary, all of which would be located with- <br /> in the Salvation Army Camp. <br /> d) Assuming that our attempts prove fruitless, the City <br /> of Columbia Heights would then be requesting the City <br /> of St. Anthony to condemn property owned by the Salvation <br /> Army Camp in order to acquire the necessary roadway ease- <br /> ment. <br /> e) If the above needs to be exercised, then obviously the <br /> cities may be required to enter a joint powers agreement <br /> in order to accomplish the desired end result , including <br /> assessment of construction costs. <br /> In my estimation, the above fairly represents our committments with regard <br /> to studying the storm drainage problems affecting the Salvation Army property <br /> and the improvements which we indicated are being considered by the City of <br /> Columbia Heights. If you feel that any of the above is not correct or does <br /> not coincide with your understanding, please be sure to contact me. <br /> As a point of information, our time frames are such that staff would be <br /> undertaking the storm drainage study as soon as possible and would begin <br /> design of the above improvements during the summer months . The scheduling <br /> for this project in our capital improvement program is such that 1981 would <br /> involve design and a public hearing with construction to be undertaken in <br /> 1982- i f approved by the--City Counc i'l . Needless Ito s'ay that prior to a <br /> public hearing, a joint powers agreement between the City of Columbia Heights <br /> and the City of St. Anthony may be required if benefitting properties in <br /> St.. Anthony are to be assessed a proportionate share of construction costs. <br /> However, I am sure that we will have ample time to discuss the details of <br /> a-_joint powers agreement sometime in the future. <br /> If you have any questions or comments regarding the above, please do not <br /> hesitate to contact me. <br /> Sincerel , <br /> Robert S. Bocwinski <br /> City Manager <br /> RSB/bj <br /> 81/12 <br /> cc: Fred Salsbury, Public-Works Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.