My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04281987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 04281987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:05:00 PM
Creation date
12/30/2015 4:04:40 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 04281987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ain ®n <br /> ilia e <br /> DATE : APPROVAL- : <br /> April 20 , 1987 -� <br /> David Childs, City-Manager <br /> FROM : \ <br /> Larry Hamer, Public Works Director <br /> I TEM : STONEHOUSE KITCHEN AND ADDITION <br /> The kitchen and new entryway will be figured together and the <br /> existing entry system will have to be moved. The entryway is 8 ' X <br /> 7 ' , the kitchen is -20 ' X 301 . _ The new addition for setting is 20 ' X <br /> 29 ' . <br /> The Kitchen and Entryway Cost <br /> Footings and blocks & 4" floors $ 5:,200 <br /> Bar joist & metal deck 1,710. <br /> Installation of bar joist & deck . .600 <br /> Kitchen door, 3 . 0 outside 325 <br /> Kitchen inside doors, two 3 . 0 600 <br /> Kitchen tile floor, 20 ' X 30 ' 848 <br /> Kitchen wall cover 200 <br /> Wood, furring, sheet rock ceiling 1 ,000 . . . <br /> Plumbing, ( rough-in 3 ,000) complete 15 ,000 <br /> Electrical, ( rough-in 3 ,000 ) complete 15 ,000 <br /> Heating extension duct work 800 <br /> Entryway doors 2 , 400 <br /> Entryway electric 400 <br /> Entryway tile floor, 7 ' X 8 ' 500 <br /> Roofing of entryway & kitchen, 38 ' X 20 ' 2 ,000 <br /> TOTAL $45, 933 <br /> The New Addition <br /> Footing, blocks and 4" floor $ 4 ,200 <br /> Bar joist & metal deck 1 , 305 <br /> Installation of bar joist & deck 550 <br /> Steel header, I beam, 29 ' installation 600 <br /> windows 3,00.0 <br /> Carpet floor, 58 sq. ft. 1, 160 <br /> Wood, furring, sheetrock ceiling 500 <br /> Electrical 1 ,000 <br /> Heating extention duct work 600 <br /> Roofing, .20 ' X 29 ' addition 1 , 500 <br /> TOTAL $13 , 425 <br /> If both additions are done, installation of the steel will be <br /> approximately $1 , 277 . I am adding a contingency fund for <br /> miscellaneous cost of $1 , 500 . <br /> : cjk4 . 28 . 87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.