Laserfiche WebLink
FEB 1 9 <br /> *Carbon steel material #C-1045 • <br /> *1-11/16" head nut, gib key and locking screws <br /> Driveshaft cost <br /> Quote Items: <br /> Furnish all necessary equipment and labor to pull the angle drive <br /> and install the driveshaft motor and new angle drive, connect <br /> into system and test Hour <br /> Furnish amount of time to remove, 3 2� Hour <br /> install motor and drive, Hour <br /> number of men. 2 <br /> Furnish hourly rate for any shop time l6 1#10s C 3� r <br /> Furnish hourly rate for possible test pumping: <br /> Number of men <br /> Labor per hour 2 rr �i �iyr <br /> Equipment per hour rx <br /> • <br /> Electrical work will be provided by the City. <br /> Return all quotes to: <br /> A 1 1,-4, 1 "' 'I <br /> Larry Hamer <br /> Public Works Director <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> by March 3 , 1988 . <br />