Laserfiche WebLink
*Carbon steel material OC-1045 • <br /> *1-11/16" head nut, gib key and locking screws <br /> ho5nn <br /> Drivesha- ft cost <br /> Quote Items: <br /> Furnish all necessary equipment and labor to pull. the angle drive <br /> and install the driveshaft motor and new angle drive, connect <br /> into system and test <br /> $ 130.00 Hour <br /> Furnish amount of time to remove, $ 5.00 Hour <br /> install motor and drive, 5.00 Hour <br /> number of men. 2.00 <br /> Furnish hourly rate for any shop time $ 40.00 <br /> Furnish hourly rate for possible test pumping: <br /> Number of men 1 <br /> Labor per hour $ 45.00 <br /> Equipment per hour $ 100.00 • <br /> Electrical work will be provided by the City. <br /> Return all quotes to: <br /> Larry Hamer � / � 7�b � O <br /> Public Works Director <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> by March 3 , 1988. <br /> KEYS WELL DRILLING CO. <br /> 413 North Lexington Parkway <br /> St. Pau1, IVIN 55104 <br /> 612/646-7871 <br /> February 26, 1988 <br /> J W s, ec/Treas. <br /> • <br />