Laserfiche WebLink
*Carbon steel material #C-1045 <br /> *1-11/16" head nut, gib key and locking screws • <br /> $600.00 <br /> Driveshaft cost <br /> Quote Items: <br /> Furnish all necessary equipment and labor to pull the angle drive <br /> and install the driveshaft motor and new angle drive, connect <br /> into system and test <br /> $135.00/ Hour <br /> Furnish amount of time to remove, 3 Hour <br /> install motor and drive, 4 Hour <br /> number of men. 2 MEN <br /> Furnish hourly rate for any shop time $40.00/HR. <br /> Furnish hourly rate for possible test pumping: <br /> Number of men 1 <br /> Labor per hour $40.00/HR. <br /> Equipment per hour $10.00/HR. • <br /> Electrical work will be provided by the City. <br /> Return all quotes to: <br /> Larry *Hamer <br /> Public Works Director <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> by March 3 , 1988 . <br /> LAYNE MINNESOTA COMPANY <br /> 3147 CALIFORNIA ST NE <br /> MPLS MN 55418 <br /> HARLES P. ALBERG, UC. ES ENT <br /> • <br />