Laserfiche WebLink
• <br /> June 7, 1988 <br /> Mr. David Childs <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dcar Dave: <br /> At your request, we have the following to report regarding the project <br /> status as of June 7, 1988: <br /> 1. Kenzie Signal Project <br /> The project is over 90% complete. This week NSP will hook-up <br /> power, the pavement markings will be painted, and sodding will be <br /> placed. <br /> 2. St. Anthony Blvd. Project <br /> Excavation is 60% complete. Class 5, granular material is being <br /> installed from Hwy. 88 up to the golf course entrance. <br /> On Wednesday of this week, local traffic will be re-routed from <br /> rieke Imy. 88 to the golf course in order to excavate from the golf course <br /> carroll and cemetery entrance to Industrial Blvd. <br /> JWuller <br /> ssociates, line. <br /> engineers 3. Temporary Water Treatment Project <br /> architects Bids were received on the temporary granular activated carbon <br /> land surveyors equipment May 19 and the contract was awarded to Calgon Carbon <br /> Corporation of Pittsburgh, PA: At this time, contracts have been <br /> equal opportunity executed and the notice to proceed has been sent. It is anticipated <br /> employer that the four 10-foot-diameter contactors will be delivered and <br /> installed by July 6, 1988. Work is proceeding on the interior piping <br /> connections and concrete equipment pads for these units. <br /> If you have any questions, please call. <br /> Sincerely, <br /> �et.Qe_ ,X6- <br /> Dale A. Watson, P.E. <br /> RIEKE CARROLL MULLER ASSOCIATES, INC. <br /> DAW:jj <br /> • <br /> 10901 red circle drive <br /> box 130 <br /> minnetonka, minnesota 55343 <br /> 612-935-6901 <br />