Laserfiche WebLink
�ENCINEERS t ARCHITECTS■PLANNERS <br /> February 15, 1991 RE: ST. ANTHONY, MINNESOTA <br /> PAVEMENT MANAGEMENT STUDY <br /> P.C. NO. 1905-93 <br /> Mr. Thomas D. Burt, City Manager <br /> City tvi St.., Aiitiiviiy <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dear Mr. Burt: <br /> As you requested, we have estimated the engineering time required <br /> to provide the City of St. Anthony with a Comprehensive Pavement <br /> Management Study. <br /> We have already furnished you with a schematic which depicts the <br /> steps required to complete the study and the services which will <br /> be provided. We feel these services will fit the needs of the <br /> City of St. Anthony for a pavement management system. In <br /> summary, the study would be compiled in the following steps: <br /> 1. All of the streets catalogued and inventoried in <br /> January, 1980 will be listed on the computer. <br /> 2. The Director of Public Works will furnish SEH with an <br /> updated maintenance history for all the pavements and <br /> the annual maintenance cost. <br /> 3. The inventory established on the computer will provide <br /> a listing of the streets in either alphabetical or <br /> numerical order complete with history data compiled <br /> from existing records. <br /> 4. A field rating survey would be . conducted by our <br /> personnel accompanied by City personnel if desired to <br /> visually rate all the pavements which are classified as <br /> City streets.__. This .- does not include county roads, - - -- <br /> - <br /> state trunk ' 'Highways --or - private streets. The field <br /> rating survey will also include rating of the various <br /> types of curbs within the City, driveway aprons and <br /> carriage walks within City right-of-way. <br /> • <br /> SHORT ELLIOTT <br /> HENDRIC*ON WC. l,RwI,ESO.A ;� <br />