My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01141992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 01141992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:14:39 PM
Creation date
12/30/2015 8:14:27 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 01141992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Study <br /> October 11, 1991 <br /> Page Two <br /> 7) Preparation of all submittals to MnDOT. • <br /> 8) Inspection, construction administration (including bidding; shop drawings and pay <br /> estimates), construction staking, and record drawings will be completed by the <br /> City of Roseville. <br /> 9) No right-of-way acquisition is anticipated. <br /> 10) As requested by the City of Roseville, there may be a need for MSA, Inc. to <br /> respond to design related issues during the construction phase. This would be <br /> billed separately on an hourly basis if requested. <br /> We have estimated a construction cost of $160,000, not including any repairs to the <br /> existing sewer and water facilities, to construct 1,400 feet of road. <br /> Based on this construction estimate we would propose to complete the above work <br /> scope for the following engineering costs: <br /> Feasibility Study $1,650.00 <br /> Plans & Specs $9.250.00 <br /> Estimated Total Engineering Costs $10,900.00 <br /> We would propose to complete this work for a not-to-exceed cost of $10,900 assum- <br /> ing that the scope of work, as described above, does not change. We reserve the right <br /> to request additional compensation if additional tasks or work efforts are requested by • <br /> the City. <br /> We are prepared to complete the feasibility study within twenty working days. Once <br /> authorized we would prepare the plans and specs within thirty working days. <br /> Yours truly, <br /> MAIER STEWART AND ASSOCIATES, INC. <br /> a12QJ 3 <br /> Thomas J. Madigan, P.E. <br /> Project Engineer <br /> TJM/jm <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.