Laserfiche WebLink
CONTTtACT ITEMS. THIS PERIOD TOTAL TO DATE <br /> ITEM ITEM DESCRIPTION <br /> NO. NIT OTY. UNIT OTY... UNIT OTY. UNIT <br /> PRICE PRE PRICE <br /> PRICE <br /> SCHEDULE 4.0 CROFT DRIVE RECONSTR. <br /> 1 REMOVE CONC. CURB& GUTTER LF 2077 $3.25 2073 $8,737.25 2073 $8,737.25 <br /> 2 ADJUST EX. MANHOLE CASTING EA 4 $130.00 0 $0.00 0 $0.00 <br /> 3 WATER FOR DUST CONTROL MGAL 15 $10.00 10 $100.00 10 $100.00 <br /> 4 COMMON EXCAVATION CY 3848 $5.30 3648 $19,334.40 3648 $19,334.40 <br /> 5 SUBGRADE PREPARATION RDSTA 10.02 $100.00 10.02 $1,002.00 10.02 $1,002.00 <br /> 8 GEOTEXTILE FABRIC SY 3430 $1.00 3430 $3,430.00 3430 $3.430.00 <br /> 7 SELECT GRANULAR BORROW(CV) CY 2290 $7.30 2290 $18,717.00 2290 $18,717.00 <br /> 8 4'PERF. (PE) CORR. PIPE DRAIN LF 2077 $3.00 2077 $8,231.00 2077 $8.231.00 <br /> 9 CLASS 5 AGGREGATE BASE TON 1150 $7.30 1150 $8,395.00 1150 $8,395.00 <br /> 10 2331.TYPE 318 BASE MIXTTRE TON 376 $24.00 0 $0.00 0 $0.00 <br /> 11 2331.TYPE 41A WEAR MIXTURE TON 282 $27.00 0 $0.00 0 $0.00 <br /> 12 BITUMINOUS TACK COAT GAL 150 $1.00 0 $0.00 0 $0.00 <br /> 13 B518 CONCRET CURB&GUTTER LF 2077 $5.20 1000 $5,200.00 1000 $5,200.00 <br /> 14 2- BIT. DRIVEWAY RESTORATION SY 77 $10.00 0 $0.00 0 $0.00 <br /> 15 8'CONC.DRIVEWAY RSTORATION SY 200 $22.00 0 $0.00 0 $0.00 <br /> 16 SAW CUT CONCRETE LF 420 $3.50 420 $1,470.00 420 $1,470.00 <br /> 17 CONCRETE DRIEWAY APRON SY 180 $22.00 0 $0.00 0 $0.00 <br /> 18 4'CONCRETE WALK SF 48 $2.30 0 $0.00 O $0.00 <br /> 19 SELECT TOPSOIL BORROW CY 75 $10.00 0 $0.00 0 $0.00 <br /> 20 SOD, LAWN&BOULEVARD TYPE SY 3200 $1.40 0 $0.00 0 $0.00 <br /> 21 SUBGRADE TESTING LS 1 $200.00 1 $200.00 1 $200.00 <br /> 22 GRANULAR BORROW TESTIN LS 1 $800.00 1 $800.00 1 $800.00 <br /> 23 CLASS 5 AGGREGATE TESTING LS 1 $900.00 1 $300.00 1 $300.00 <br /> 24 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 4.0 CROFT DRIVE RECONSTR.-Total $89,918.65 $89,916.65 <br /> SCHEDULE 5.0 COOLIDGE& 27TH AVE ST.IMPROVE, <br /> 0 3 1 REMOVE CONC.CURB&GUTTER LF 1300 $3.25 1000 $3,250.00 1000 $3,250.00 <br /> REMOVE BITUMINOUS PAVEMENT. SY 2050 $1.70 1500 $2,550.00 1500 $2.550.00 <br /> EROSION CONTROL LF 800 $2.00 0 $0.00 0 $0.00 <br /> 4 COMMON EXCAVATION CY 2881 $5.30 0 $0.00 0 $0.00 <br /> 5 CLEAR 7 GRUBS TREE(OVER 6' DIA.) EA 5 $150.00 2 $300.00 2 $300.00 <br /> 8 SUBGRADE PREPARATION RDSTA 8.5 $200.00 0 $0.00 0 $0.00 <br /> 7 GEOTEXTILE FABRIC SY 2311 $1.00 0 $0.00 0 $0.00 <br /> 8 WATER FOR DUST CONTROL MGAL 10 $10.00 0 $0.00 0 $0.00 <br /> 9 SELECT GRANULAR BORROW(CV) CY 1540 $7.30 0 $0.00 0 $0.00 <br /> 10 4'PERF. (PE)CORR.PIPE DRAIN LF 1320 $3.00 0 $0.00 0 $0.00 <br /> 11 CLASS 5 AGGREGATE BASE TON 780 $7.30 0 $0.00 0 $0.00 <br /> 12 2331.TYPE 318 BASE MIXTURE TON 255 $24.00 0 $0.00 0 $0.00 <br /> 13 2331,TYPE 41A WEAR MIXTURE TON 191 $27.00 O $0.00 0 $0.00 <br /> 14 BITUMINOUS TACK COAT GAL 101 $1.00 0 $0.00 0 $0.00 <br /> 15 B818 CONCRETE CURB&GUTTER LF 1320 $5.20 0 $0.00 0 $0.00 <br /> 18 2-BIT.DRIVEWAY RESTORATOIN SY 24 $10.00 0 $0.00 0 $0.00 <br /> 17 6'CONC.DRIVEWAY RESTORATION SY 28 $22.00 0 $0.00 0 $0.00 <br /> 18 CONCRETE DRIVEWAY APRON SY 20 $22.00 0 $0.00 0 $0.00 <br /> 19 SELECT TOPSOIL BORROW CY 150 $10.00 0 $0.00 0 $0.00 <br /> 20 SEEDING ACRE 1 $1,200.00 0 $0.00 0 $0.00 <br /> 21 SOD,LAWN&BOULEVARD TYPE S 3200 $1.50 0 $0.00 0 $0.00 <br /> 22 SUBGRADE TESTING LS 1 $200.00 0 $0.00 0 $0.00 <br /> 23 GRANULAR BORROW TESTING LS 1 $500.00 0 $0.00 0 $0.00 <br /> 24 CLASS 5 AGGREGATE TESTING LS 1 $200.00 0 $0.00 O $0.00 <br /> 25 BITUMINOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 5.0 COOLIDGE&27TH AVE ST.IMPROVE. H.R.A. Project $8,100.00 $8,100.00 <br /> SCHEDULE 6.1 STORM SEWER ALT, BID <br /> 1 REMOVE EXISTING RCP STORM SEWER LF 238 $4.00 238 $944.00 238 $944.00 <br /> 2 REMOVE EXIST.CB/MH STRUCTURE EA 10 $120.00 8 $720.00 8 $720.00 <br /> 3 15'HOPE LF 342 $19.00 216 $4,104.00 216 $4,104.00 <br /> STD.STORM MANHOLE(48'DIAJ EA 5 $1,200.00 4 $4,800.00 4- $4,800.00 <br /> STD.STORM MANHOLE 148'DIA.) EA 4 $1,200.00 2 $2.400.00 2 $2.400.00 <br /> 8 GRANULAR FOUNDATION MAT'L TON 35 $10.00 20 $200.00 20 $200.00 <br /> T SCHEDULE 6.1 STORM SEWER IMPROVEMENTS-Total $13.168.00 $13.168.00 <br /> 490015.No1 <br />