Laserfiche WebLink
PARTIAL PAY ESTIMATE <br /> #2 <br /> FROM: OCTOBER 1, 1993 <br /> TO: OCTOBER 30, 1993 <br /> CONTRACTOR: PROGRESSIVE CONTRACTORS,INC. O py <br /> ADDRESS: 8736 ZACHARY LANE,OSSEO,MN 55369 <br /> OWNER: CITY OF ST.ANTHONY,MINNESOTA <br /> PROJECT: 37TH AVENUE CONCRETE STREET REHABILITATION <br /> COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL: November 13, 1993 ORIGINAL: $ 241,179.50 <br /> REVISED: REVISED: <br /> CONTRACT <br /> jQM <br /> ITEM <br /> ITEM DESCRIPTION.: is <br /> ......... ... <br /> UNR QTY UNIT:'::: <br /> ............ ...... <br /> PRICE PRICE <br /> ................ <br /> .......... <br /> SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS <br /> 1 MOBILIZATION LS 1 $28,700.00 0.5 $13,350.00 1.0 $28,700.00 <br /> 2 REMOVE CONC.CURB&GUTTER LF 20 $7.00 0 $0.00 19 $133.00 <br /> 3 Be CONCRETE CURB LF 20 $15.00 0 $0.00 19 $285.00 <br /> 4 CL. 5 AGG. ( 100%CRSHD LIMESTNE) TON 500 $10.00 0 $0.00 0 $0.00 <br /> 5 CONCRETE PAVEMENT PLANING SY 10500 $3.75 9387 $35,201.25 9387 $35,201.25 <br /> 8 SEAL CONCRETE PAVEMENT(3723) LB. 1250 $3.00 900 $2,700.00 900 $2,700.00 <br /> 7 SEAL CONCRETE PAVMNT(SILICONE) LB. 900 $7.50 382 $2,715.00 382 $2,715.00 <br /> 8 1/2"JOINT REPAIR(TYPE A-1 MOD) LF 6000 $1.00 2472 $2,472.00 2472 $2,472.00 <br /> 9 1/2" LONGITDNL.JNT.TRP. (TYPE A-5) LF 11500 $0.80 6240 $3,744.00 8240 $3,744.00 <br /> 10 CRACK REPAIR(TYPE A-3) LF 250 $1.50 48 $72.00 48 $72.00 <br /> 11 SPOT SURFACE REPAIR(TYPE S-2A) SF 540 $15.00 347 $5,205.00 519 $7.785.00 <br /> 12 SURFACE REPAIR(TYPE 8-28) (>30SF) SF ISO $10.00 0.0 $0.00 8.4 $64.00 <br /> 13 SPOT FULL DEPTH REPAIR(TYPE C-1) SF 655 $23.00 0 $0.00 230 $5,290.00 <br /> 14 CONCRETE PAVEMENT(TYPE D) SY 1700 $35.00 952 $33,320.00 1884 $58,940.00 <br /> 15 NO.8 REINFORCEMENT BARS LB. 6800 $1.50 4612 $6,918.00 8092 $9,138.00 <br /> 16 F&I NEEHNAH R-3250-1 CASTING ASSMBL EA 1 $400.00 0 $0.00 1 $400.00 <br /> 17 TRAFFIC CONTROL LS 1 $10,000.00 0.5 $5,000.00 1.0 $10,000.00 <br /> IS ADJUST M.H.CASTING EA 17 $150.00 0 $0.00 a $1,200.00 <br /> 19 ADJUST C.B.CASTING EA 7 $175.00 0 $0.00 2 $350.00 <br /> 20 PAVEMENT MARKINGS LS 1 $1,100.00 0 $0.00 0 $0.00 <br /> T SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS-Total $110,697.25 $167,189.25 <br /> SCHEDULE 2.0 SIDEWALK CONSTRUCTION <br /> I REMOVE CONC.CURB&GUTTER LF 28 $6.00 25 $150.00 25 $150.00 <br /> 2 CL. 5 AGG. (100% CRSHD LIMESTONE) TON 240 $12.00 193 $2,318.00 193 $2,316.00 <br /> 3 4*THICK CONCRETE SIDEWALK SF 10990 $1.80 10000 $16,000.00 10000 $18,000.00 <br /> 4 6'THICK CONCRETE SIDEWALK SF 1000 $2.15 0 $0.00 0 $0.00 <br /> 5 PEDESTRIAN RAMP EA 2 $300.00 2 $800.00 2 $800.00 <br /> 6 REMOVE ASPHALT PAVEMENT SY 75 $6.00 75 $450.00 75 $450.00 <br /> 7 REMOVE CONCRETE PAVEMENT SY 85 $12.00 22 $264.00 22 $264.00 <br /> 8 2" SIT. DRIVEWAY RESTORATION SY 75 612.00 0 $0.00 0 $0.00 <br /> 9 CLEARING &GRUBBING TREES LS 1 $1,500.00 1 $1,500.00 1 $1,500.00 <br /> 10 ADJUST M.If.CASTING EA 7 060.00 2 $320.00 2 $320.00 <br /> 11 SELECT TOPSOIL BORROW CY 180 $10.00 0 $0.00 0 $0.00 <br /> 12 SOD, LAWN&BOULEVARD TYPE SY 2850 $1.95 0 $0.00 0 $0.00 <br /> 13 Be CONCRETE CURB LF 28 $15.00 28 $420.00 28 $420.00 <br /> w SCHEDULE 2,0 SIDEWALK CONSTRUCTION-Total $22,020.00 $22,020.00 <br /> TOTAL THIS PERIOD $132.717.25 <br /> TOTAL TO DATE $189.209.25 <br /> 490018.No.2 <br />