My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09241996
StAnthony
>
City Council
>
City Council Packets
>
1996
>
CC PACKET 09241996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:30:48 PM
Creation date
12/30/2015 6:30:36 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09241996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Program <br /> Continued <br /> . . .- _ 3.6 Wastewater System Plan <br /> Prepare policies and strategies for preventing and reducing excessive, <br /> inflow and infiltration into the metropolitan wastewater system. (We C' <br /> know that St. Anthony has made great improvements in'this regard <br /> already.) Based upon an estimate of the severity of the problem, G <br /> describe a-program for reducing or preventing inflow and infiltration. <br /> . '3.7 Water Supply Plan. E <br /> Include the City's existing, approved.water. supply Plan as it E <br /> presently exists; without changes. <br /> 3.8 Solar Access Protection Plan <br /> Prepare objectives and policies to protect solar access and.a <br /> description of plans for implementing these objectives and policies. <br /> 3.9 workshops #3, 4 and 5 <br /> Meet with the Planning Commission to review and refine the draft E <br /> -plan elements; concentrating on one or two subjects each meeting. E <br /> - The City Council could, of course, be invited to attend these meetings <br /> also, if desired. Receive approval from the City Council to submit a E <br /> draft plan to the Metropolitan Council for their 90-day review for <br /> consistency with Regional systems. E <br /> 3.10,City Council Review E <br /> F Submit a draft of the plan to the City Council after.it has been 1° <br /> through"the Planning Commission;summarize it for them and record <br /> their comments. E <br /> 4.0` Implementation 4.1. Official Controls <br /> Program <br /> Describe any changes to zoning, sign, subdivision or other.official.' Eo <br /> controls'that may have been determined necessary implement any <br /> of the preceding plan.elements, particularly land.use and E <br /> transportation. <br /> 4.2.' Capital Improvements Program <br /> With the assistance of City staff, prepare afive=year capital E <br /> improvements program listing major improvements.to streets, the : • <br /> BRW, Inc: 10. Comprehensive Plan Update <br /> #23»> ;City'of St.Anthony <br />
The URL can be used to link to this page
Your browser does not support the video tag.