Laserfiche WebLink
HRA Meeting Minutes <br /> August 27, 1996 <br /> Page 2 • <br /> 1 Commissioner Enrooth asked if the adult league could play in a modified adult field. Mr. <br /> 2 . O'Brien stated it may be a possibility but not a desired situation. Commissioner Faust suggested <br /> 3 Kathy be included in the discussions also as $14,000 may be well worth the money. <br /> 4 Commissioner Wagner stated he would prefer to have a Little League field and the play area. <br /> 5 Chair Ranallo suggested staff research the options. Mr. Morrison stated the City just got <br /> 6 approval from the Rice Creek Watershed and if changes are made the City would have to get <br /> 7 approval again. <br /> 8 Commissioner Marks suggested a location for a performing fine arts area and indicated the <br /> 9 location on a map. <br /> 10 Mr. O'Brien noted when doing construction an old catch basin was found and it will cost$1,000 <br /> 11 for removal. Chair Ranallo asked why the maintenance department of the City couldn't remove <br /> 12 the catch basin. The Executive Director will check with the Public Works Director to see if this <br /> 13 is possible. <br /> 14 Mr. Jim O'Brien reviewed the options for the Authority to consider on the layout of the council <br /> 15 chambers. <br /> 16 The current design has the bench of the council facing north. Mr. O'Brien reviewed the • <br /> 17 advantages/,disadvantages and seating capacity of this option: <br /> 18 Advantages <br /> 19 - Public enters from rear, causing less disturbance during meetings <br /> 20 - Aesthetics-bench centered on room <br /> 21 - Both sets of double doors can be used to exit <br /> 22 Disadvantages, <br /> 23 - Conference seating faces side <br /> 24 Seatiniz <br /> 25 - 60 in conference <br /> 26 - 59 in chamber <br /> 27 Option 2 shows an East Facing Bench: <br /> 28 Advantages <br /> 29 - Will face conference room <br /> 30 Disadvantages <br /> 31 - One set of double doors will not be usable <br /> 32 - More lobby noise will be heard by Council <br /> 33 - Changes in construction-items include electrical conduit and floor raceway/trench, <br /> 34 patching,relocate lighting • <br />