Laserfiche WebLink
City of St.Anthony <br /> 1997 Street and Watermain Improvements <br /> • Estimated Project Costs and Assessments <br /> RCM Project No. 10366.02 <br /> Table 1 <br /> Breakdown of Construction Costs <br /> Total Construction Cost= $520,002.64 <br /> Total Street Construction Costs= $334,183.49 <br /> Total Watermain Construction Costs= $98,872.65 <br /> Total Storm Sewer Construction Costs= $86,946.50 <br /> Table 2 <br /> Breakdown of Project Costs(including Engineering&Administration) <br /> Total Project Costs= $636,852.64 <br /> Total Street Project Costs= $409,278.00 <br /> Total Watermain Project Costs= $121,090.36 <br /> Total Stone Sewer Project Costs= $106,484.28 <br /> Table 3 <br /> Breakdown of Street Costs <br /> • Total Assessable Footage for all Streets=3,993.21 LF <br /> Total Street Project Cost(includes engineering,legal and admin.) $409,278.00 <br /> Assessable Amount(35%) $143,247.30 <br /> City Amount(65%) $266,030.70 <br /> Estimated Assessment Rate per Foot=$35.87 <br /> (including bonding costs,but does not include water service connection assessment) <br /> Table 4 <br /> Breakdown of Watermain Costs <br /> Total Watermain Project Cost(includes engineering,legal and admin.) $121,090.36 <br /> Assessable Amount($400 per connection,37 Connections) ($14,800.00) <br /> City Amount $106,290.36 <br /> Table 5 <br /> Breakdown of Total Estimated Project Costs <br /> Assessed Share(Streets and Water Connection) $158,047.30 <br /> City Share(Streets and Watermain) $372,321.06 <br /> • Storm Sewer $106,484.28 <br /> Total Estimated Project Cost $636,852.64 <br />