My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10281997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 10281997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:35:39 PM
Creation date
12/30/2015 6:35:29 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 10281997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAV Liquor - Erickson Oil Storm Sewer <br /> Estimate of Construction Cost <br /> prepared by:Westwood Professional Services,Inc. 913191 <br /> 1 Bulkhead and Abandon Inplace Pipe UN FT 60 $14.20 $852.00 <br /> 2 Connect to Existing Stub EACH l $120.00 $120.00 <br /> 3 15"R.C.Pipe LIN FT 13 $24.50 $318.50 <br /> 4 Oversizing(12"to 15") LIN FT 190 $3.25 $61750 <br /> TOTAL: S1,908A0 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.