My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10281997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 10281997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:35:39 PM
Creation date
12/30/2015 6:35:29 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 10281997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE OWNER ❑ <br /> ARCHITECT ❑ <br /> ORDER CONTRACTOR 1:1 GRADS CONTRACTIN <br /> AIA DOCUMENT G701 FIELD El <br /> .OTHER ❑ D ppT 1 4 1997 <br /> PROJECT: ST.ANTHONY CITY HALL&COMMUNITYCTR. CHANGE ORA rSMBER: 13 <br /> (name, address) SILVER LAKE RD.AT 33RD <br /> ST.ANTHONY.MN DATE: OCTOBER 10,1897 <br /> TO CONTRACTOR: ARCHITECT'S PROJECT NO: 9214 <br /> (name, address) CONTRACT DATE: <br /> OCTOBER,1995 <br /> GRADS CONSTRUCTION COMPANY <br /> P.O.BOX 34 CONTRACT FOR: GENERAL CONSTRUCTION.INCLUDNG <br /> HASTINGS,MN 55033 MECHANICAL AND ELECTRICAL <br /> The Contract is changed as follows: <br /> 1. Raceway changes in Council Room add 856.00 <br /> 2.Duplex receptical to center of AN Room south wall add 148.00 <br /> 3.Additional soap and towel dispensers in Rooms 13, 15, 17, 104, 106 add 832.00 <br /> 4.Signage changes add 240.00 <br /> 5. Modifications for moving Council Bench add 4723.00 <br /> 6.Change flooring in Interview Room to Vinyl Comp Tile,save carpet for AN Room add 1254.00 <br /> 7.Floor sealer change,wiring for disposals and two water heaters add 1051.07 <br /> 8.Credit for landscaping allowance not used deduct 11875.00 <br /> NET CHANGE deduct $2771.00 <br /> Not valid until signed by the Owner, Architect and Contractor. <br /> The original(Contract Sum)(Guaranteed Maximum Price)was . . . . . . . . . . . . . . . . . . . . . . . .S 3,151,900.00 <br /> Net change by previously authorized Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 119,114.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was. . . . . . . . . .S 3,271,014.00 <br /> The(Contract Sum)(Guaranteed Maximum Price)will be(increased)(decreased) <br /> (unchanged)by this Change Order in the amount of . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 (2771.00) <br /> The new(Contract Sum)(Guaranteed Maximum Price)including this Change Order will be . .S 3,268,243.00 <br /> The Contract Time will be(increased)(decreased)(unchanged)by ( )days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is DECEMBER,1996 <br /> NOTE: "Phis summary does not reflect changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by <br /> Constriction Change Directive. <br /> W ILLIAMSOBRIEN ASSOC GRANS CONSTRUCTION THE CITY OF ST.ANTHONY VILLAGE <br /> ARCHITECT CONTRACTOR OWNER <br /> 1111 THIRD AVE.S.,SUITE 156 P.O.BOX 34 3301 SILVER LAKE RD. <br /> Address Address Address <br /> MINN P LIS,MN t)4 SINGS,MN 033 ST.ANT ,MN 418 <br /> BY BY <br /> 15Y <br /> � 16- ® ^ ® <br /> DATE q <br /> 1� <br /> • I I CAUTION: You should sign 'an original AIA document which has this caution printed in red. <br /> An original assures that changes will not be obscured as may occur when documents are reproduced. <br /> AIA DOCUMENT G701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE <br /> AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON. D.C. 20M6 G701-1987 <br /> WARNING:Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.