My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08082000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 08082000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:16:04 PM
Creation date
12/30/2015 4:15:51 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08082000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> • The final tenant mix will produce no great external impacts, including <br /> outdoor storage (unless allowed in a commercial zoning district under the <br /> Zoning Ordinance). All uses will be contained within the Building with <br /> any external impacts (i.e., outdoor storage, loading docks, etc.), meeting or <br /> exceeding standards of the Zoning Ordinance. <br /> While the Applicant desires and intends to pursue the Preferred Plan, the <br /> Applicant needs maximum flexibility (through the terms of the PUD Agreement) <br /> to succeed. The need for "flexibility" has been often discussed by the Applicant. <br /> It generally means that the Applicant cannot be required to come back before the <br /> Planning Commission and/or City Council for discretionary approvals. To do so <br /> will prevent the Applicant from marketing the project and representing to tenants <br /> that only building permits are required to proceed with a particular space. <br /> The particular tenants will drive the phasing of the internal and external <br /> improvements (e.g., landscaping, signage, etc.). The Applicant: (i) does not <br /> intend on commencing external improvements, weather conditions permitting, <br /> until after a lease or leases are signed; (ii) all of the existing retailers, except <br /> Herbergers, will need to immediately vacate Apache Plaza; (iii) Herbergers may <br /> or may not vacate its space in the near future; and (iv) within 60 to 90 days of <br /> closing on the purchase of the subject property, the Applicant intends to <br /> commence the construction of two (2) show Office show spaces of approximately <br /> a total of 4,000 square feet to demonstrate to perspective tenants the quality of the <br /> • project (the Preferred Plan). <br /> Any new construction on the Apache Plaza Property will require approvals <br /> pursuant to the requirements of the PUD Ordinance. <br /> ii. Baseline Comparison Proiects <br /> It is the Applicant's intention to approach the redevelopment of Apache Plaza of <br /> the New Market Property like its other projects, many of which have been <br /> inspected by City officials. Similar finishes, specifications and standards will be <br /> used on this project, depending on the tenant mix. <br /> The Applicant has projects comparable in finish and specifications and <br /> performance standards that compare to either the Preferred Plan or the Fallback <br /> Plan. Those baseline projects are as follows: <br /> a. Preferred Plan — Mappcor facility at 1125 Energy Park Drive, St. <br /> Paul, Minnesota("Preferred Plan Baseline"); <br /> b. Fallback Plan — 2001 Kennedy St. NE/2000 Sumner Street NE <br /> ("Fallback Plan Baseline") <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.