My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08082000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 08082000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:16:04 PM
Creation date
12/30/2015 4:15:51 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08082000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 102 <br /> Infrastructure Improvements <br /> During the past few years, in support of past residential and community wishes, there <br /> has been significant reconstruction of.City streets and park infrastructures. As.part of <br /> the annual road improvement project and increased need for park usage, this activity <br /> will likely continue over the next 5 - 10 years. <br /> One of the goals the City Council established in March of 2000 was to provide 100- <br /> year flood protection for all residents and businesses. The 2001,2002 and 2003 <br /> Road Improvement Projects all provide additional benefit to the 100-year flood <br /> protection project <br /> Next year's project is scheduled for West Armour Terrace and 30`h Avenue NE. <br /> Funding for road improvements continues to be at 35% being assessed to the property <br /> owners and 65% levied over the entire community for their use of City streets. <br /> Projects to be completed in 2000 include: the Silver Lake Road Bridge Project (from <br /> 37' Avenue to Silver Lane), the Signal Light at 37d' and Highcrest, the 29" Avenue <br /> Street Project and the 33rd Avenue MSA Road Project. Final completion of these <br /> projects and payment for the services will be completed in 2001. <br /> The planning and design of the Public Works facility is on going and will continue in <br /> 2001. The building of a new facility is contingent upon available funding, which has <br /> yet to be determined. SEH will be conducting a building needs assessment in 2000 to <br /> determine the cost of repairing or replacing all City buildings. <br /> Providing a Park System that offers a mix of recreational opportunities for <br /> residents of all ages will continue the focus of the Parks Commission. Many Changes <br /> and renovations to Silver Point Park, the newly created Water Tower Park, Central <br /> Park and Emerald Park are being discussed and reviewed. <br /> Levy Limits <br /> This year, the State removed the levy limit restriction on Cities that had been in place <br /> for three years. The 2001 levy totals $1,763,475, which represents a 7.07% <br /> increase compared to last years levy of$1,646,970. The removal of the levy limits <br /> should not be interpreted as an indicator that this year's levy was increased to offset <br /> previous years' constraints. <br /> The proposed increase in the levy includes an inflationary increase over last year's <br /> actual expenditures; a permanent line item for VillageFest; reduction in the Clinton <br /> Cops Grant revenue; new and innovative Fire Protection programs; the establishment of <br /> • Budget Reserves as a line item and an additional full-time Park's employee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.