My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09262000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 09262000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:17:43 PM
Creation date
12/30/2015 4:17:29 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 09262000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2001 Street& Utility Construction Project Opinion of Probable Cost <br /> ' City of St. Anthony,MN <br /> Schedule A -Street Construction <br /> ' Unit Cost <br /> Item No. Description Quantity Unit Total <br /> I Mobilization I LS $20,000.00 $20,000.00 <br /> ' 2 Clear and Grub Trees 5 Each $500.00 $2,500.00 <br /> 3 Remove Bituminous Pavement 12,300 SY $2.50 $30,750.00 <br /> 4 Remove Curb and Gutter _ - j_ 7,750 1 Lin FT ! $2.00 $15,500.00 <br /> 5 Remove Concrete Pavement j 900 ! Sq Yd $5.00 $4,500.00 <br /> 6 Remove Concrete Walk 100 Sq Ft _ $1.00 ! $100.00 <br /> 7 Bituminous Sawcut 450 Lin Ft $3.00 $1,350.00 <br /> 8 Concrete Sawcut 850 Lin Ft $5.00 $4,250.00 <br /> 9 Sub grade Excavation 9,100 Cu Yd $6.00 $54,600.00 <br /> 10 Select Granular Borrow 5,800 Cu.Yd $12.00_ $69,600.00 <br /> 1 1 Class 5 Aggregate Base(100%Crushed) j 4,500 j Ton $11.00 $49,500.00 <br /> 12 :_Typc 41-Bituminous Wear Course(1-1/2") 1,100 Ton S31.00 534,100.00 <br /> 13 Type 31 Bituminous Base Course 2" 1,500 Ton $30.00 $45,000.00 <br /> ' 14 Bituminous Tack Coat 700 Gal $1.50 $1,050.00 <br /> 15 B618 Curb and Gutter 7,750 Lin Ft $7.00 . $54,250.00 <br /> 16 : 4"Concrete Walk - 100 ! Sq Ft 52.00 $200.00 <br /> j 17 6"Concrete Driveway Pavement 1,100 Sci Yd $32.00 $35,200.00 <br /> 18 Bituminous Driveway Pavement 230 Sq Yd $18.00 $4,140.00 <br /> ' 19 Sod(including topsoil and fertilizer 11,000 S Yd $2.00 $22,000.00 <br /> 20 2-1/2"Trees 5 Tree $400.00 $2,000.00 <br /> 21 6"Perforated PE Pipe Drain 7,750 Lin Ft $5.00 $38,750.00 <br /> ' 22 Type V Geotextile Fabric 13,750 1 Sq Yd $1.50 $20,625.00 <br /> Subtotal $509,965.00 <br /> ' +10%Contingencies $50,996.50 <br /> Subtotal $560,961.50 <br /> ' +30%Administrative 1 $168,288.45 <br /> Grand Total 1 $729,249.95 <br /> 1 <br /> 1 <br /> ' City of St.Anthony- Feasibility Report <br /> 2001 Street and Utility Construction Project ,wA <br /> WSB Project No. 1065-511 WSB <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.