My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09262000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 09262000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:17:43 PM
Creation date
12/30/2015 4:17:29 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 09262000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2001 Street&Utility Construction Project Opinion of Probable Cost <br /> ' City of St.Anthony,MN <br /> t Schedule D-Storm Sewer <br /> Item No. ; Description I Quantity Unit Unit Cost Total <br /> I Remove Storm Sewer All sizes 2,700 Lin Ft $8.0 $21,600.00 <br /> 1 2 Remove Manholes 6 Each $300.0 $1,800.00 <br /> 3 Remove Catch Basins 14 Each $250.00 $3,500.00 <br /> ' 4 _48" RCP Class III 594 Lin Ft $100.00; $59,400.00 <br /> f <br /> 5 36 RCP Class lll_ _ 73 Lin Ft _ $60.00, $4,380.00 <br /> 6 27"RCP Class III 500 Lin Ft $40.00- $20,000.00 <br /> 7 24"RCP Class III 40 Lin Ft $37.0 $1,480.00 <br /> 8 21"RCP Class III 803 Lin Ft $35.0 $28,105.00 <br /> ' 9 18"RCP Class III 275 Lin Ft $30.0 $8,250.00 <br /> 10 15"RCP Class III 850 Lin Ft _ $26.0 $22,100.00, <br /> 11 48" Diameter Manhole i 42 Lin Ft $200.00; $8,400.00 <br /> 1 - - ....-- - to --------- - ---- ---- - - ---- — - -- -------- --- <br /> 12 60" Diameter Manhole 34 Lin Ft $250.00, $8,500.00 <br /> L 13 72" Diameter Manhole 30 Lin Ft $270.00 $8,100.00 <br /> t14 84"Diameter Manhole 10 Lin Ft $480.0 $4,800.00 <br /> 15 Manhole Casting___-_ 14 Each $300.0 _- $4,200.00-! <br /> 16 Catch Basins I 22 Each $900.00, $19,800.00 <br /> 17 18" RCApron wlTrash Guard 1 Each $800.00 $800.00 <br /> 18 Connect to Existing Storm Sewer 2 Each $500.00 $1,000.00 <br /> ' Subtotal $226,215.00 <br /> +10%Contingencies $22,621.50 <br /> ' Subtotal $248,836.50 <br /> +30%Administrative $74,650.95 <br /> Grand Total $323,487.45 <br /> Total Project Costs <br /> ' Schedule A-Streets $729,249.95 <br /> Schedule B-Sanitary Sewer $196,710.80 <br /> tSchedule C-Watermain $326,697.80 <br /> Schedule D-Storm Sewer $323,487.45 <br /> Total-Schedules A-D i $1,576,146.00 <br /> ' City of St.Anthony- Feasibility Report <br /> 2001 Street and Utility Construction Project ��� <br /> WSB Project No. 1065-511 <br />
The URL can be used to link to this page
Your browser does not support the video tag.