My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10232001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 10232001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:54:09 PM
Creation date
12/30/2015 7:53:59 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 10232001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> City Council Regular Meeting Minutes <br /> September 25, 2001 <br /> • Page 7 <br /> t -retaining wall <br /> 2 -shrubs at bench and wall <br /> 3 -trees (balled and burlapped) <br /> 4 -lamp posts with flags <br /> 5 -berms <br /> 6 -re-sod <br /> 7 Community Center: <br /> 8 -new door frames/signage 6'0"; lighting/wood frames <br /> 9 -community service signage <br /> 10 Total Cost: $50,147.37 <br /> ll <br /> 12 Phase Three: <br /> 13 Building Exterior: <br /> 14 -adding quoins to all corners <br /> ® 15 Community Center: <br /> 16 -new door frames/signage 6'0", lighting/wood frames <br /> 17 -Community Service signage <br /> 18 <br /> 19 City Hall Chambers Doors: <br /> 20 -new oak door with lites, existing hardware (pair) <br /> 21 -adding wood detail to dias <br /> 22 -framing historical pictures <br /> 23 -paint above burnish block <br /> 24 City Hall Chambers <br /> 25 -new partition electric control <br /> 26 Multi-Purpose Room: <br /> 27 -new partition electric control <br /> 28 Total Cost, Phase Three: $53,740.26 <br /> 29 Councilmember Sparks indicated that the electric partition portion was the suggestion of Jay Hartman, <br /> 30 not the entire task force. <br />
The URL can be used to link to this page
Your browser does not support the video tag.