My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10232001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 10232001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:54:09 PM
Creation date
12/30/2015 7:53:59 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 10232001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58 <br /> 2. Structuring of questions and final approval of the survey instrument. These activities to be <br /> • completed within three weeks of the initiation of the contract. <br /> 3. Final determination of the field dates for interviewing. <br /> 4: Pre-testing and, if needed, approval of resulting revisions. This activity to be completed by the <br /> second day of fieldwork. <br /> 5. Completion of all fieldwork within a four-to-five week period. <br /> 6. Computer analysis and preparation of written report. All analytical tests and commentary will <br /> be available within three weeks after completion of the field work. <br /> 7. Delivery of the final written report to the City of Saint Anthony and presentation of the results <br /> and implications at a formal or workshop meeting. Afterwards, telephone consultation, as the <br /> : need arises, will be provided about the study's findings and implications. <br /> PROJECT COSTS: <br /> The cost of a survey is driven by two factors: sample size and questionnaire length. A 60-70 <br /> question item, 400 household random sample of the City of Saint Anthony would cost $9,700.00. <br /> • Each additional question item beyond the initial allotment would be $125.00. <br /> As company policy, DRL requires one-half of the cost prior to the commencement of field work; <br /> the remainder is due upon delivery of the final written report. Unless otherwise arranged, DRL <br /> invoices clients for the initial payment at the time of the initiation of the contract; the remainder is <br /> due at the time of the receipt of the final written report. <br /> If you require any further information from us, feel free to contact either Diane or me. We look <br /> forward to the opportunity to work once again with the City of Saint Anthony, but, in any case, <br /> wish you well with this project. <br /> Sincerely, <br /> 'William D. Morris <br /> William D. Moms, Ph.D. <br /> President <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.