Laserfiche WebLink
on <br /> science theme 'utillZing the woods, marsn and lake shore as teaching resources. <br /> F <br /> .,then not in Day Camp use it might be the site for large group c;cnics, c=pacie <br /> of accommodating an entire resident camp popuiation. . <br /> he basic requirements for a maintenance area are usually a three bay, 2.700 <br /> square foot, building with inside storage, work bench, heated office and toiiet. 0 <br /> The outside work and storage area should be fenced and secured. It should <br /> be oriented and designed for maximum soiar gain. The building should blend <br /> with, not intrude into, its surroundings. <br /> The Staff Community should generally be off-limits to campers. This is. the <br /> place for the staff to separate from their daily demands to relax, refresh, and <br /> renew. The clubhouse might be their private activity building, remodeled and <br /> used in whatever manner they choose. <br /> The existing structures along the lake shore are irreplaceable due to building <br /> code setback restrictions. They should be well maintained in order to extend OR their usable life as long as possible. The old St.Paul canteen can be remodeled <br /> to offer an attractive, up-to-date and efficient facility for storage. <br /> The officer's resident can be made more private by adding privacy hedges and <br /> a patio fence. <br /> The proposed Staff Community consists of three, 1.000 square foot, family <br /> apartment, four 500 square foot rooms, and six 650 square foot rooms with a <br /> common lounge. There is additional staff housing. in existing cabins. Staff <br /> k. <br /> "children" of all ages would enjoy using the play yard and a large grass play <br /> area for yard games, street games, frisbee, and other activities. Additional <br /> landscaping will provide privacy and removal of the existirg drive would <br /> connect the staff village more directly with Silver Lake. <br /> Development of the staff community is a very low priority, only after a <br /> thorough evaluation indicates a definite need. So long as staff can be <br /> O <br /> 32 <br /> r <br />