My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 04182000
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2000
>
PL PACKET 04182000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:36:18 PM
Creation date
12/30/2015 7:36:08 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 04182000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Meeting Minutes <br /> March 21, 2000 <br /> Page 5 <br /> 1 Tillmann inquired if there were other places in St. Anthony that Nextel had considered for the in- <br /> 2 stallation of antennas. Mr..Nelson responded that the Apache Medical Building is one of the <br /> 3 highest buildings in the area and was best suited to alleviate blank spots that have been located <br /> 4 within the service area. <br /> 5 Bergstrom asked about the time frame that Nextel anticipated for the installation. Mr. Nelson re- <br /> 6 sponded that once the permit is obtained,that Nextel would be ready to order materials and an- <br /> 7 ticipated completion by June 2000. <br /> 8 Morrison offered that there would be a public hearing held on this issue on April 18, 2000. <br /> 9 Thomas suggested that if the Apache Medical Building is a choice location, he wondered if sev- <br /> 1 o eral of the wireless companies could work together to have one structure supporting several an- <br /> 11 tennas. <br /> 12 Mr. Nelson cautioned against the concept because problems can arise when many antennas are in <br /> 13 close proximity. <br /> 14 Thomas suggested that, at the public hearing, Mr.Nelson could provide photographs of the types <br /> 15 of installations that Nextel would not recommend and also photographs of recommended <br /> �6 installations. <br /> 17 Bergstrom agreed that would be an excellent idea for a comparison. <br /> 18 Morrison offered that there would likely be a concern from the surrounding neighborhood if too <br /> 19 many antennas were installed, as well as concerns about the capability of the roof to hold more <br /> 20 than a certain amount. <br /> 21 In regard to leasing the water tower, Morrison said a request had previously been received and <br /> 22 was turned down by the City because the offered lease rate was deemed too low. However, the <br /> 23 new City Council has determined that leasing the water tower for telecommunications antennas <br /> 24 could be a viable option and a source of revenue. <br /> 25 Chair Bergstrom thanked Mr.Nelson for his presentation and invited him to return on April 18, <br /> 26 2000 for the public hearing. <br /> 27 VIII. OTHER BUSINESS. <br /> 28 A. Apache Plaza Update, Tankenoff, Hillcrest Development, Will Introduce Proposed <br /> 29 Zoning for and Other Updates. <br /> 30 Morrison updated the Commission that Hillcrest Development has proposed a zoning change for <br /> 31 the property known as Apache Plaza to a C-2 district. In addition, the City Council has author- <br /> 2 ized the retention of a planning firm, Dahlgren, Shardlow, Uban("DSU")to assist the Planning <br /> 33 Commission with zoning issues, facade, and planning. Chair Bergstrom and City Manager will <br /> 34 be meeting with the firm later this week. <br />
The URL can be used to link to this page
Your browser does not support the video tag.