Laserfiche WebLink
Mr. David M. Childs <br /> June 2, 1982 <br /> Page 4 <br /> (f) Who will be responsible for handling legal work? <br /> Holmes & Graven, Chartered. <br /> Is the cost included in the fees as resented? <br /> Yes, with the exception of legal service as bond counsel and <br /> condemnation proceedings as otherwise referenced herein. <br /> (g) Who will be responsible for handling construction management? <br /> The proposal of Holmes & Graven does not include construction <br /> management other than the coordination of land acquisition, <br /> disposition, and relocation. We would see the City's engineer as <br /> probably the most appropriate to handle this technical function. <br /> However, we would be in a position to subcontract this function out. <br /> Is the cost included in the fees as resented? <br /> No. <br /> • (h) Who will be responsible for handling land surveys? <br /> Subcontract <br /> Brauer & Associates, Ltd., Inc. <br /> 7901 Flying Cloud Drive <br /> Eden Prairie, Minnesota 55344 <br /> Contact: Fred L. ;7,;,isington <br /> The firm of Brauer & Associates has assisted a number of public <br /> sector and private sector clients. The firm is versed in all aspects of <br /> land use planning, design, landscape architecture, and engineering. <br /> Is the cost included in the fees as presented? <br /> No. Same rationale as highlighted in 2(a) above. <br /> (3) Briefly describe the methodology you will use to locate an <br /> interested/qualified develo er develo ers. <br /> We would prefer to remain flexible regarding this phase and in a timely <br /> manner review with the City Manager the then appropriate options based on <br /> the dictates of the,project's goals, objectives and timetables. We believe to <br /> suggest either a very limited informal local search or an elaborate regional <br /> or national search would be premature at this time. To some extent the <br /> methodology may be directly related to the ultimate method of disposition <br />