My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05081984
StAnthony
>
City Council
>
City Council Packets
>
1984
>
CC PACKET 05081984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:56:28 PM
Creation date
12/30/2015 3:56:11 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 05081984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 4 - 1 <br /> The Metro Council spokesman discussed some of the changes he perceives , <br /> • with the appointment of a new Metro Council Chair who he indicated would <br /> be chairing all appointment committes herself. He announced there would <br /> be a public hearing June 11 to establish a 15 member Regional Transit <br /> Board for which a chairman would be sought, a position for which Mr. Wiger <br /> believes Alice Rainville is the current forerunner. The Manager reiterated <br /> his appreciation of the assistance the Metro Council had given staff <br /> related to the development of a housing plan for bonding and in the pre- <br /> paration of the City's six year Capital Improvement Plan and said he was <br /> most pleased with the innovative methods the Mosquito Control Agency had <br /> implemented this year. <br /> Ms. Fletcher who told the Council she had only been on the Metro Waste <br /> Control Commission for ten months, indicated she was in attendance to review <br /> the MWCC's cost allocation system and to answer specific questions about <br /> the rates charged the City. She was accompanied by Ray Odde, Engineer, <br /> and Dick Berg, Finance Officer, from the Metro Waste Staff, who addressed <br /> some of the technical questions which were raised during the discussion. I. <br /> In the middle of her presentation, Brad Bjorklund of the Planning Commission �. <br /> arrived and expressed his displeasure with not being able to get into the <br /> building because all the doors were locked and lights in the hallways turned <br /> off. He questioned whether other persons who were interested in the Council <br /> business that night might also have been prevented from attendance. He was <br /> told the doors had been open at 6:30 when the Council conducted the Board of <br /> Review, and at 7:15 p.m. when the secretary had arrived, and the janitor <br /> • must have mistakenly locked up the building sometime in the interim. Mr. <br /> Childs promised to investigate the matter and to notify Mr. Bjorklund in <br /> writing of what he found. <br /> Ms. Fletcher distributed copies of the presentation she gave orally, in <br /> which she had addressed the City's charges for MWCC's treatment; the Area <br /> I service costs; and the costs estimated for the City in 1985. There was <br /> also a comparison between estimated and actual sewer charges from 1971-1983 <br /> and Mr. Odde had provided the final sewage. figures for 1983; a. graph <br /> depicting flow figures from 1974 through 1983; and a comparison of flow <br /> and cost figures for the 101 communities serviced by MWCC. <br /> Included in the agenda packet was Mr. Hamer's March 28 report on his <br /> attendance at a MWCC costs meeting in which he had addressed certain area <br /> of concern which he perceived required further clarification. He. reiterated <br /> that staff still had serious concerns about the accuracy and reliability <br /> of the metering of the City's discharge versus the water pumped by the City <br />-- and-said-the-repet-it-i-on-of-estimated-bill-s-was--the-basi-s—for-some-of these <br /> concerns. The discrepancy in these figures, as well as the fact that the <br /> City's population had decreased by 2,000 persons in the last few years, had <br /> caused him to question the accuracy of the MWCC estimates, especially in <br /> view of the fact that the highest figures seemed to occur in the winter <br /> months when only a minimum of infiltration from residential footing tile <br /> and sump pumps would be expected. <br /> The Public Works Director told Mr. Odde the City had undertaken a program <br /> • of televising the City's sewer lines and repairing any defects in them, <br /> and he therefore, no longer believed that type of infiltration could be a <br /> major factor in the flow figures. Councilman Makowske wondered if the decline <br /> in school age population in the community should not have reduced the use <br /> of water for showering and washing hair to some extent, to .which Mr. Odde <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.