Laserfiche WebLink
i V <br /> PROPOSAL FOR <br /> REPLACEMENT, -SANDBLASTING, 'AND RECOATING <br /> TWO GENERAL IRON REMOVAL FILTERS <br /> .Bids To Be Opened: 10: 30 A.M. ,- on Thursday, the 9th day of <br /> November, 1989. <br /> Gentlemen: <br /> The undersigned, being familiar with your local conditions, <br /> having made all necessary field investigations, and being <br /> familiar with all other factors affecting the conditions and <br /> costs for the project, hereby proposes to furnish all labor, <br /> material, equipment, tools, skills and all else necessary to <br /> completely perform: <br /> CHANGE IN QUANTITIES _ <br /> MEDIA REPLACEMENT, SANDBLASTING, AND RECOATING <br /> TWO GENERAL IRON REMOVAL FILTERS <br /> Unit <br /> Item Description Unit Ouant. Price Total <br /> 1. Graded gravel, size 1'k" X 3/4" cu.ft. 260 $ 11. 12 $ 2,891.20 <br /> t2.. Graded gravel, size 3/4" X k" cu.ft. 266 $ 11. 12 $ 2,957.92 <br /> 3. Graded gravel , size k" X �" cu. ft. 272 $ 11.. 12 $ 3,024.64 <br /> 4 . Graded gravel, size 4" X #10 cu.ft. 210 $ 11. 12 $ 2,335.20 <br /> 5. Filter sand, size 0.45 to - 0.55 MM <br /> UNIF. COEF. 1. 6 cu. ft. 1704 $ 11. 12 $ 18,948.48 <br /> 6. Diffuser Replacement/Repairs each 100 $ 7.50. $ 750.00 <br /> 7 . Welding lin. inch 200 $ 4.80 $ 960.00 <br /> 8. Painting is $ $ 17,600.00 <br /> TOTAL PROJECT COST FOR TWO IRON FILTERS $ 49,467.44 <br /> Accompanying this Bid is a (certified check for 5% of the Bid) <br /> (Bid Bond for lot of the Bid) made payable to the City of St. <br /> Anthony and the same is subject to forfeiture in the event of <br /> default on the part of the undersigned. to execute the prescribed <br /> contract and bond within fifteen (15) days after its submittal to <br /> the City. <br /> In submitting this bid, it is understood that payment will be by <br /> check. The undersigned is familiar with the time of completion <br /> requirements of the specifications. <br /> It is understood that bids may not be withdrawn for a period of <br /> thirty (30) days after the date and time set for the opening of <br /> bids. It is understood that the City Council reserves the right <br /> to retain the certified check or bond of the three (3) lowest <br /> bidders as determined by the City Council for a period of not to <br /> exceed thirty ( 30) days after the date set for bid opening. <br />