My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11141989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 11141989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:39:54 PM
Creation date
12/30/2015 4:39:44 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 11141989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PROPOSAL FOR <br /> MEDIA REPLACEMENT, SANDBLASTING, AND RECOATING <br /> TWO GENERAL IRON REMOVAL YILTERS <br /> Bids To Be Opened: 10: 30 A.M. , on Thursday, the 9th day of <br /> November, 1989. <br /> Gentlemen: <br /> The undersigned, being familiar with your local conditions, <br /> having made all necessary field investigations, and being <br /> familiar with all other factors affecting the .conditions and <br /> costs for the project, hereby proposes to furnish all labor, <br /> material , equipment, tools, skills and all else necessary to <br /> completely perform: <br /> CHANGE IN QUANTITIES <br /> MEDIA REPLACEMENT, SANDBLASTING, AND RECOATING <br /> TWO GENERAL IRON REMOVAL FILTERS <br /> Unit <br /> Item Description Unit ouant. Price Total <br /> 1. Graded gravel, size 1'h" X 3/4" cu.ft. 260 $ $ 3 2v <br /> • 2. Graded gravel, size 3/4" X 4" cu. ft. 266 $ 1 L "= $ <br /> 3 . Graded gravel, size 4" X 4" cu.ft. 272 $ it <br /> 4 . Graded gravel, size 4" X #10 cu.ft. 210 $ 7L ' <br /> 5. Filter sand, size 0.45 to 0.55 MM <br /> UNIF. COEF. 1.6 cu. ft. 1704 $ I :I <br /> 6. Diffuser Replacement/Repairs each 100 $ - $ <br /> 7. Welding lin. inch 200 $ C' $ _- <br /> 8. Painting is $ 1 ` "$ ti-' .a �= <br /> TOTAL PROJECT COST .FOR TWO IRON FILTERS $_T_ <br /> Accompanying this Bid is a (certified check for 5% of the Bid) <br /> (Bid Bond for 100 of the Bid) made payable to the City of St. <br /> Anthony and the same is subject to forfeiture in the event of <br /> default on the part of the undersigned to execute the prescribed <br /> contract and bond within fifteen (15) days after its submittal to <br /> the City. <br /> In submitting this bid, it is understood that payment will be by <br /> check. The undersigned is familiar with the time of completion <br /> requirements of the specifications. <br /> It is understood that bids may not be withdrawn for a period of <br /> thirty (30) days after the date and time set for the opening of <br /> bids. It is understood that the City Council reserves the right <br /> to retain the certified check or bond of the three (3) lowest <br /> bidders as--determined by the City Council for a period of not to <br /> exceed thirty (30) days after the date set for bid opening. <br />
The URL can be used to link to this page
Your browser does not support the video tag.