My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11131990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 11131990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:09:28 PM
Creation date
12/30/2015 8:09:17 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 11131990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ain h0 <br /> iiflla 'le <br /> DATE : APPROVAL : <br /> NOVEMBER 9 .1990 <br /> TO : H.R.A. Commissioners <br /> FROM : Thomas D. Burt, Executive Director <br /> ITEM : LANEL CURB CUT <br /> This item was tabled until LaNel provided information on the increased cost of the curb cut on <br /> Kenzie Terrace. They have supplied the requested information which explains the increased cost. <br /> The items the HRA requested LaNel to complete have been done except the easement for the <br /> Walker line across Krause-Anderson's property and the landscaping on the south side of the <br /> property along Northgate. Mayor Ranallo and I met with Frank Lang and Paul Brewer on <br /> November 6th to discuss these two items. LaNel agreed to provide a letter guaranteeing they would <br /> negotiate their easement for,the Walker line with Krause-Anderson or move the sewer line if the <br /> work is not done by a set time. <br /> Mr. Lang explained why the walkway was left out and said he does not have the funds to complete <br /> the walkway. He said when the architect prepared the plans for Autumn Woods, he concerned <br /> himself only with the property owned by LaNel. These plans were then inspected by Dwayne <br /> Grace, the City's contract building inspector, who was not aware of the walkway. Mr. Lang recalls <br /> the discussion on the walkway. However, the plans prepared and subsequently bid on did not <br /> include the walkway. Mr. Lang explained that he cannot require the contractor to install the <br /> walkway since it was not part of the plan nor does he have the funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.