My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09241991
StAnthony
>
City Council
>
City Council Packets
>
1991
>
CC PACKET 09241991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:13:14 PM
Creation date
12/30/2015 8:13:05 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 09241991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0923/91 12:22 e-+EY i'.:;I I N � i1U4 <br /> 2.2 All of Contractor's vehicles, used for the collection of recyclables-unde: <br /> this Contract shall be equipped with (i) warnLng flashers; (ii) a broom and shovel for <br /> spills; (iii) Contractor's name and telephone number, visible and prominently <br /> displayed at all times on the right and left sides of the vehicle; and (iv) such other <br /> equipment as the City may hereafter reasonably req-aire. <br /> 2.3 Cont-actor shall make the pickups of rnaterials %NIth vehicles with closed <br /> tops so constructed that their contents H:I1 not spill. <br /> 2.4 Contractor shall keep all equipment used in the performance of the work <br /> in good operating condition and in a clear., sanitary condition. <br /> 2.5 Contractor's employees shall handle all containers with reasonable care to <br /> avoid damage, and shall immediately clean up and dispose of any contents thereof <br /> which may be spilled. <br /> 2.6 Contractor will take all precautions necessary to protect the public against <br /> injury during Contractor's collection, transporting and disposal of material <br /> pursuant to this Contract. <br /> 3. OIVINTRSHIP OF MATERIALS <br /> 3.1 All recyclable materials placed for collection shall be owned by and the <br /> responsibility of the City until they are handled by Contractor. Upon handling the <br /> recyclable materials by Contractor, the recyclable materials shall become the property <br /> and responsibility of Contractor. <br /> 4. REPORTING <br /> 4.1 Contractor must report the amount and type of recyclable material and <br /> where the materials are delivered for recycling. Minnesota Statutes, Section <br /> 115A.553 requires counties to ensure that materials are taken to markets for sale or <br /> recycling processing centers. Consequently, if Contractor delivers materials to a <br /> broker, Contractor must report what end market the broker used. Summaries by <br /> brokers and end markets must be provided to the City every month and must be <br /> provided no later than 30 days after the end of each month. If materials are stored <br /> for a period longer than 30 days by Contractor , the amount of the materials by type <br /> and location of storage must be reported to the City. <br /> 4.2 Contractor must provide the City with certified weight receipts for the <br /> monthly collection of all recyclable materials. Each month's weight receipts must be <br /> .2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.