Laserfiche WebLink
BID TABULATION <br /> l ------------------------------- <br /> PROJECT: WATER SYSTEM IMPROVEMENTS (490-009-20) <br /> OWNER: CITY OF ST. ANTHONY <br /> DATE: NOVEMBER 4; 1992 <br /> ENGINEER: MAIER STEWART AND ASSOCIATES, INC. <br /> ---:------------ :------------------------ ------------------------s :GRIDOR CONSTRUCTION, INC:RICHMAR CONSTRUCTION :RICE LAKE CONTRACTING :PENN CONTRACTING, <br />INC. <br /> ITEMS ITEM DESCRIPTION :UNIT QUANTITY :UNIT PRICE TOTAL PRICE :UNIT PRICE TOTAL PRICE :UNIT PRICE TOTAL PRICE :UNIT PRICE TOTAL PRICE : <br /> --- <br /> -----------------------------.-----------------.-------------- ---------.-------------------------s------------------------ ------------------------ <br /> •SCHEDULE 1.0 WATER SYSTEM <br /> ------------------------------ <br /> 1 COMMON EXCAVATION CY 50 17.40 870.00 10.00 500.00 10.00 500.00 2.50 125.00 <br /> _ 2 SUBGRADE PREPARATION RDSTA 1 1.4 370.00 518.00 500.00 700.00 100.00 140.00 500.00 700.00 <br /> 3 CLASS 5 NATURAL AGGREGATE TON 90 18.60 1674.00 15.00 1350.00 9.00 810.00 18.50 1665.00 <br /> 4 2331, TYPE 41A WEAR COURSE MIX TON 40 31.25 1250.00 125.00 5000.00 40.00 1600.00 69.00 2760.00 <br /> 5 CONCRETE SPLASH PAD EA 1 201.00 201.00 100.00 100.00 100.00 100.00 650.00 650.00 <br /> b REMOVE AND REPLACE FENCE LS 1 1395.00 1395.00 1500.00 1500.00 500.00 500.00 3750.00 3750.00 <br /> 7 _.REMOVE/SALVAGE EXIST WATERMAIN LF 170 10.90 1853.00 10.00 1700.00 2.00 340.00 10.00 1700.00 <br /> -8° FURNISH & INSTALL SUMP PUMP - LS 1 1321.00 1321.00 650.00 650.00 500.00 500.00 1500.00 1500.00 <br /> 9 SITE GRADING LS 1 905.00 905.00 2500.00 2500.00 600.00 600.00 .2500.00 2500.00 <br /> 10 SODDING, LAWN & BOULEVARD TYPE SY 1700 2.09 3553.00 2.20 3740.00 2.00 3400.00 2.90 4930.00 <br /> 11 12' DIP WATERMAIN LF 245 35.80 8771.00 40.00 9800.00 20.00 4900.00 28.00 6860.00 <br /> 12 14' DIP WATERMAIN LF 3 207.00 621.00 100.00 300.00 30.00 90.00 75.00 225.00 <br /> 13 12' VALVE EA 2 839.00 1678.00 1200.00 2400.00 700.00 1400.00 2000.00 4000.00 <br /> 14 14' VALVE EA 2 1767.00 3534.00 1800.00 3600.00 1200.00 2400.00 4000.00 8000.00 <br /> _1• 15 BREAK INTO VAULT LS 1 1210.00 1210.00 1000.00 1000.00 200.00 200.00 1500.00 1500.00 <br /> 16 CONNECT TO EXIST. WATERMAIN LS 1 895.00 895.00 1000.00 1000.00 200.00 200.00 12000.00 12000.00 <br /> 17 FITTINGS LBS 1500 1.02 1530.00 2.00 3000.00 1.00 1500.00 2.80 4200.00 <br /> 18 PUMP STATION PIPING LS 1 10405.00 10405.00 16200.00 16200.00 10000.00 10000.00 14750.00 14750.00 <br /> 19 FURNISH & INSTALL PUMP EA 2 12072.00 24144.00 11600.00 23200.00 11000.00 22000.00 18000.00 36000.00 <br /> 20 ELECTRICAL LS 1 38490.00 38490.00 35800.00 35800.00 30000.00 30000.00 36750.00 36750.00 <br /> 21 PUMP STATION BUILDING LS 1 57225.00 57225.00 49290.00 49290.00 94000.00 94000.00 64000.00 64000.00 <br /> T SCHEDULE 1.0 WATER SYSTEM IMPROVEMENTS--TOTAL $162,043.00 $163,330.00 $175,180.00 $208,565.00 <br /> I HEREBY CERTIFY THAT THIS IS AN ACCURATE TABULATION OF THE BIDS <br /> RECEIVED FOR THE ABOVE MENTIONED PROJECT. j <br /> i <br /> NAME: VIRGIL G. HAWKINS, P.E. <br /> DATE: NOVEMBER 4, 1992 <br /> MN REG. NO.: 19941 <br />