My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03221994
StAnthony
>
City Council
>
City Council Packets
>
1994
>
CC PACKET 03221994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:28:36 PM
Creation date
12/30/2015 8:28:22 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 03221994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
105 South 5th Street <br /> Box 530 Minneapolis MN 55440 <br /> Tel(612)347-8000 <br /> CP Rail,System <br /> December 21 , 1993 <br /> Operating Department <br /> Heavy Haul-US <br /> Engr. File: X-PAY-005-50-R <br /> Mr. Larry Hamer <br /> Director Public Works <br /> Village of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Dear Mr. Hamer: RE: STINSON BOULEVARD <br /> DOT# 688 993P - MILE POST D5.50 <br /> MINNEAPOLIS, MN <br /> This letter confirms our three-way phone conversation with yourself <br /> and Mr. Mark Winson, Director of Public Works for the City of <br /> Columbia Heights, on Monday December 20, 1993 concerning. a proposed <br /> rubber crossing surface at the above location. <br /> Soo Line would provide, at its expense: Labor, material and <br /> equipment to remove the existing crossing material; reconstruct the <br /> rail , ties and ballast through the complete crossing area; install <br /> rubber surfaced crossing material through the traveled roadway; <br /> provide and install treated hardwood crossing timber through the <br /> shoulder and sidewalk areas as required; and remove the abandoned <br /> east bound main line from the crossing surface. The City will <br /> provide, at its expense: Necessary traffic control, signs, and <br /> detours during reconstruction of the crossing; rubber surfaced <br /> crossing material; replacement of the asphalt/concrete pavement; and <br /> disposal of existing crossing surface. <br /> The city should purchase the rubber crossing surface directly. <br /> The anticipated cost of rubber crossing material is between $170 and <br /> $200 per foot. We suggest you obtain price quotations from the <br /> following suppliers which are acceptable to Soo Line Railroad. <br /> The rubber crossing would be for Soo Line standard 115 pound <br /> continuous welded rail . Tapered end plates are not required. <br /> Riedel-Omni Products Hi-Rail Corporation <br /> 3911 Dayton Street 600 West Jackson Blvd.-Suite 580 <br /> McHenry, IL 60050 Chicago, IL 60606 <br /> Phone: 815-344-3100 Phone: 312-648-4875 <br /> Mr. Bob Cigrang Mr. Larry Schaefer <br /> Specify either Standard Duty - Specify full depth rubber <br /> or Heavy Duty full depth rubber <br /> Goodyear Tire & Rubber Company <br /> 5100 West 35th Street <br /> Minneapolis, MN 55416 <br /> Phone: 612-924-4544 <br /> Ms. Angela Field <br /> Specify full depth rubber <br />
The URL can be used to link to this page
Your browser does not support the video tag.