My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09131994
StAnthony
>
City Council
>
City Council Packets
>
1994
>
CC PACKET 09131994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:22:09 PM
Creation date
12/30/2015 6:21:59 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09131994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HSIi August 25, 1994 <br /> COV1 L11%ENG11�S <br /> File No: 490-015-30 <br /> Mr. Michael Morrison <br /> City Manager <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> C101 ENGINCERING: <br /> RE: FINAL PAY ESTIMATE <br /> ENIVIPON,C.-NTAI 1993 STREET IMPROVEMENTS <br /> CITY OF ST. ANTHONY, MINNESOTA 55418 <br /> 1AUNICIPAI <br /> Dear Mr. Morrison: <br /> PUNNING <br /> It is our understanding that the City Council tabled action on the final payment on the <br /> STRUCTURAI above project at its August 23, 1994 regular meeting. <br /> 0 There was some confusion, as we understand it, regarding what extra work was done on <br /> SURVD7NG the projects. <br /> TRAFFIC Enclosed is a memo faxed to Mr. Larry Hamer on June 9, 1994 in which I talked about <br /> in general terms what caused the extra costs and why. <br /> TRANSPORTATION <br /> However, we wanted with this letter to further clarify why the costs occurred. <br /> Change Order #1 which was previously approved by the City included work associated <br /> with changes the gas station made on their site plans which caused modification; to our <br /> construction plans which has already been bid and awarded. It involved extra concrete <br /> driveway apron work. That change order also included revisions to the watermain work <br /> at 27th and Coolridge because City record drawings which we used as a design basis for <br /> the construction plans were not what was found when we dug up the roads. <br /> 9800 Shelard Parkway The berms placed in the boulevards at 27th and Coolridge were added by the City after <br /> Minneapolis,MN 55441 contract award and were placed in Change Order #1. <br /> 612.546.0432 The extra concrete work listed at the end of the final pay estimate was the result of <br /> Fax:612.5446398 Hennepin County requiring more of Kenzie Terrace.removed and replaced than what we <br /> had planned for. We had submitted as we are required a permit application to them and <br /> 0 326 Energy Park Drive they requested the additional work to better align the left turn lane with the new road <br /> entrance to Kenzie Terrace created with this project. <br /> St.Paul,MN 55108 <br /> 612.6444389 <br /> Fax:612.6449446 490/015-2501.aug <br />
The URL can be used to link to this page
Your browser does not support the video tag.