Laserfiche WebLink
Project Description SAV Liquor • <br /> The proposed project is a liquor store for the City of St. Anthony Village of approximately 8,500 <br /> square feet consisting of a 4,800 square foot addition and the remodeling of approximately 3,700 <br /> square feet of the existing Tires-Plus Building at Apache Plaza in St. Anthony Village, <br /> Minnesota. Tires-Plus remains a tenant in the south end of the building occupying <br /> approximately 6,800 square feet. The Architect's basic services do not include any work <br /> associated with either the exterior or interior of the Tires-Plus portion of the building. <br /> The remodeling will include the demolition of an existing 1,475 square foot mezzanine,the <br /> removal of a stair into the existing basement and infill of the existing stair opening, infill of <br /> existing exterior wall openings and addition of new exterior wall openings. The new addition <br /> will be a one-story building with a new stair to the existing basement. There will be no canopy <br /> overhang on the new addition. The structural system will consist of a steel bar joist/metal deck <br /> roof system supported by an interior steel beam and column line and exterior load bearing CMU <br /> walls. <br /> The Schematic Design Phase has been completed under a separate contract. The project will <br /> proceed based on the Schematic Design drawings prepared by KKE Architects, Al - A3 dated <br /> August 13, 1996. The Architect's basic services consist of those described herein and include <br /> normal Structural, Mechanical, Electrical and Civil Engineering. <br /> The project has already received Planning Commission and City Council approval. It is • <br /> anticipated that Authorization to Proceed with the remaining phases of the project will occur in <br /> mid-March. The project will be competitively bid and will be awarded to the lowest qualified <br /> bidder. We will not be responsible for preparing any Statements of Probable Construction Costs. <br /> The Owner is proceeding with the project based on the Valu Engineering of a previous <br /> Preliminary Cost of Construction prepared by Welsh Construction. Any changes to the project <br /> after the bids are received as a result of the project being over the Owner's budget shall be <br /> considered as additional services. <br /> A preliminary project schedule is attached. <br /> • <br /> KKE Architects <br /> February 26,1997 <br /> file:9508 1 17925/proposal <br />