Laserfiche WebLink
• June 26, 1997 <br /> Mr.Larry Hamer <br /> Public Works Director <br /> City of St.Anthony <br /> 3301 Silver Lake Road <br /> St.Anthony,MN 55418 <br /> Re: Proposal for Professional Engineering Services <br /> St.Anthony Boulevard Improvements <br /> Stinson Boulevard to Silver Lake Road <br /> _ RCM File No. 10415.00. <br /> Dear Mr. Hamer: <br /> At your request,RCM submits this proposal to prepare a feasibility report which evaluates the <br /> Ic III need to replace deteriorated sidewalk along both sides of St. Anthony Boulevard between <br /> Stinson Boulevard and Silver Lake Road. <br /> rieke Our proposed scope of services for preparing the report includes a field review of the proposed <br /> carroll project loton i dent g and evaluatin g P roP� P rovements,estimatin cost of-proposed <br /> muller <br /> Fitecfates, inc. improvements,developing a preliminary assessment roll and defining a project schedule.The <br /> t ers report will be reviewed with City staff and will be presented by RCM to City Council. <br /> s s <br /> land surveyors <br /> Based on our understanding of the project scope and on the scope of services outlined above, <br /> equal opportunity our fee for developing the feasibility report is$2,400,including expenses. <br /> employer <br /> If you have any questions regarding this proposal,please contact us. <br /> Sincerely, <br /> RIEKE CARROLL MULLER ASSOCIATES,INC. <br /> Qetlt� <br /> Robert L. Moberg,P.E. it (�?Hlady Koutsoumbos,P.E. <br /> Project Manager Vice President <br /> - <br /> Robert F. Roskop> P.E.PhD <br /> Chairman <br /> 10901 red circle dr. c: Mike Mornson <br /> office box 130 <br /> RlWtonka, mn <br /> 55343-0130 <br /> (612)935-6901 <br /> fax(612) 935-8814 <br /> www.rcm-assoc.com <br />