My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09231997
StAnthony
>
City Council
>
City Council Packets
>
1997
>
CC PACKET 09231997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:35:10 PM
Creation date
12/30/2015 6:35:01 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09231997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br /> September 9, 1997 <br /> • Page 6 . <br /> 1 lighting which would cost approximately $126,000. State-Aid Funding could be used for this <br /> 2 enhancement if the lighting poles and fixtures are City standard units. <br /> 3 Mr. Solar stated another possibility is the addition of sidewalks on the east side of Silver Lake <br /> 4 Road at a total cost of$33,460. The County has recently changed their policy and would <br /> 5 fund 25% of the cost which would result in a cost to the City of$25,100. This does not <br /> 6 include the cost of the sidewalk on the bridge as that cost is included in the bridge cost. <br /> 7 State-Aid Funds could be used for the cost. <br /> 8 Mayor Ranallo stated he has received several calls from residents who do not want a sidewalk <br /> 9 installed on the east side of Silver Lake Road. They are concerned with the loss of parking <br /> 10 area and turnaround. This would affect the townhome owners especially, and Mayor noted a <br /> 11 public meeting should be held to discuss this issue. <br /> 12 Marks asked if the sidewalks would be installed adjacent to Silver Lake Road. <br /> 13 Mr. Solar stated that normally the sidewalks are installed six to eight feet from the curb. He <br /> 14 noted that at the intersection of Silver Lane the sidewalks may be adjacent to the curb. <br /> 15 Marks noted there have been problems in the past with the clearing of ice and snow on the <br /> �6 sidewalks on the west side of the bridge. There has been a conflict as to who was responsible <br /> 7 for the clearing.of the sidewalks. <br /> 18 Mr. Solar stated the clearing of snow on sidewalks is clearly the responsibility of the City but <br /> 19 the clearing of snow on a bridge is clearly the responsibility of the County. He noted <br /> 20 however sidewalks are not a high priority to the County. <br /> 21 Marks stated he was concerned with the bridge design. He noted that the plowing of the <br /> 22 current bridge creates a ridge of ice that is extremely dangerous. <br /> 23 Mr. Solar-stated another element of the bridge project is the installation of a new watermain <br /> 24 on the west side of Silver Lake Road. The current watermain is under Silver Lake Road and <br /> 25 presents a number of problems in terms of servicing. The cost for installation of the <br /> 26 watermain is $168,000. He noted replacement of the sidewalk on the west side of Silver Lake <br /> 27 Road is included in this cost although he inspected the sidewalk and felt it was generally in <br /> 28 good shape. <br /> 29 Morrison noted he had asked Bob Moberg of RCM to determine if the watermain needs to be <br /> 30 replaced at this time. <br /> 31 Mr. Solar then presented four options for bridge enhancements. He responded to a previous <br /> 32 question of Councilmember Marks by noting that the new design will allow the snow to be <br /> Is 3 pushed off the bridge and not onto the sides as the previous design required. <br /> 34 Mr. Solar asked the Council for direction as to how to move forward with the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.