My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05121998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 05121998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:38:29 PM
Creation date
12/30/2015 6:38:20 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 05121998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• February 18, 1998 <br /> Mr. Mike Morrison <br /> City of St.Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony,MN 55418-1699 <br /> Re: Proposal for Engineering Services <br /> Recoating of Elevated Water Storage Tank <br /> St. Anthony,MN <br /> RCM File No. 10456.00 <br /> Dear Mr. Mornson: <br /> Rieke Carroll Muller Associates, Inc. (RCM) appreciates the opportunity to provide the City <br /> of St.Anthony with this proposal to prepare an engineering report which will identify the scope <br /> of work needed to rehabilitate and recoat the City's elevated water storage tank.Preparation of <br /> the report will include collection,review and analysis of available information as well as a site <br /> Ic III survey of the present coating system and structure to determine their condition. The site survey <br /> will be a visual inspection both inside and outside the tank and samples of the existing coating <br /> rieke system will be collected so that we can identify the proper preparation work and develop the <br /> carroll data necessary for specifying a compatible coating system. The report will also include <br /> muller estimated construction costs for the project,including welding and miscellaneous repairs. <br /> rciates, inc. <br /> �n ee rs <br /> ects Once the report has been completed by RCM and approved by the City,project specifications <br /> land surveyors can be prepared to encompass the repairs and recoating details identified in the report. <br /> equal opportunity <br /> employer RCM proposes to provide this report to the City of St.Anthony for a lump sum fee of$4,800, <br /> including expenses. <br /> RCM understands that the City intends to have its new logo painted on the tower. Recognizing <br /> that the new logo is a different color from the old one, it may be necessary to change the base <br /> color of the tower to more closely complement the color of the new logo. RCM recommends that <br /> the City select a color combination and logo placement scheme to be used with the tower <br /> a'. recoating. To assist the City with its selection process,we can provide a representative color <br /> palette and a schematic representation of the tower with the new logo. <br /> years Please call us if you have questions. <br /> of <br /> helping <br /> build Sincerely, <br /> communities <br /> RIEKE CARROLL MULL ASSOCIATES,INC. <br /> G� t� <br /> chard C. Potz Harfy Koutsoumbos,P.E. <br /> 10901 red circle dr. Project Manager Vice President <br /> AM office box 130 <br /> etonka, mn <br /> 55343-0130 <br /> (612)935-6901 L. law sen,P.E. <br /> fax(612)935-8814 President/CEO <br /> www.rcm-assoc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.